My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5.6 & 5.7
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2002
>
04-23-2002
>
Item 5.6 & 5.7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2018 3:05:34 PM
Creation date
7/16/2018 3:05:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � <br /> ..�i Howarc R. Green Company <br /> April 17, 2002 <br /> File: 811185J-0240 <br /> Ms. Michele McPherson <br /> Director of Planning <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330-0490 <br /> RE: KLIEVER LAKE FIELDS EAST ADDITION <br /> Dear Ms. McPherson: <br /> As requested, we have reviewed the submittal package for the proposed plat of Kliever <br /> Lake Fields East Addition. The packet we reviewed was prepared by Pioneer <br /> Engineering and dated February 25, 2002. The submittal package contained a <br /> • preliminary plat, preliminary grading plan, preliminary site and utility plan, preliminary <br /> detail plan, and preliminary landscape plan. Based on our review and comments <br /> received at the staff review meeting, we would offer the following comments: <br /> 1. The plat contains approximately 23 acres and is proposed to be divided into 116 <br /> townhome lots. The plat is just east of Kliever Lake Fields First Addition and abuts <br /> County Road 12 on the north and Fillmore Street on the east. <br /> 2. The only proposed access to the plat would be Street A as it connects to Johnson <br /> Street in Kliever Lake Fields Addition on the west side of Kliever Lake Fields East. <br /> In order to develop this many units, the proposed road in a future addition that <br /> would be in the southeast quadrant of this plat accessing Fillmore Street, needs to <br /> be constructed with this development connecting Street A and Street B to Fillmore <br /> Street. The plat should be revised to include this as part of the Kliever Lake Fields <br /> East Addition. <br /> 3. The proposed street section is 28 feet back to back. The minimum required street <br /> section of this type of development is 28 feet face to face. The standard detail on <br /> Sheet 4 of 5 needs to be revised to reflect this dimension. <br /> The streets are proposed to be publicly owned and maintained. However, with 116 <br /> townhome units, the street frontage is primarily driveway openings. This is <br /> especially true of Street B. Therefore, there needs to be an understanding in the <br /> association documents that if snow needs to be hauled from the driveway and <br /> • boulevard areas, it will be done so by the association and not by the City. <br /> Ltr 4i 0Energy a7PC'Dnve • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.