Laserfiche WebLink
Planning Commission <br /> February 26,2002 <br /> Page 2 <br /> III Overview <br /> The request consists of a 4,235 sq.ft.building. The facility will be a one-story building with <br /> a full basement. The entire building will be treated with an Exterior Insulating Finish System <br /> (EIFS) with a standing seam metal roof. The majority of the basement will be devoted to <br /> storage along with mechanical and electrical spaces and the vault. The first floor will house <br /> office space,tellers, conference room, file room, lounge and restrooms. The facility will <br /> have three drive-thru teller lanes with the possibility of adding three more in the future. <br /> There are also provisions on the site plan for future expansion. <br /> Building setbacks are not defined in the Elk River Crossing PUD but the building does meet <br /> the C3 zoning setbacks. <br /> Design Standards <br /> The proposed building materials for the facades will be EIFS with accents of rock-face <br /> concrete blocks at the base of the columns.The roofing material will be a prefinished metal <br /> standing seam system. The entrance is clearly defined and the there will be EIFS banding on <br /> the facades to break up the surface. The proposed design meets the design standards for Elk <br /> River Crossing. There are two walls signs being proposed which do not exceed the <br /> maximum size allowed. <br /> • The trash enclosure will be located within the building. <br /> Landscaping <br /> The submitted landscape plan meets the city's requirements, although the location of a <br /> monument sign has not been indicated. <br /> Parking and Circulation <br /> Based on the square footage of the building and the City's requirement of one parking stall <br /> for every 200 sq. ft., a total of 21 parking stalls would be required. The proposed layout <br /> exceeds this requirement with a total of 27 total stalls. A minimum 10'setback from the <br /> property line is also maintained. <br /> Two(2)handicap-parking stalls are required for the building. The submitted site plan shows <br /> one(1)stall,which does not meet the requirements. For parking lots with 26-50 stalls,there <br /> is a minimum requirement of two accessible stalls. There is also a concern as to why the <br /> proposed stall is located so far from the entrance. <br /> The proposed layout provides two accesses to the site off of Zane Street. One access is at <br /> the shared drive with the Conoco and Wash'N Fill to the north and the second is off of a <br /> shared drive on the south side of the property. Staff has a concern about the amount of <br /> traffic that might be generated from the drive-thru teller windows and how it may be <br /> • circulated towards the exit on the north side of the property. Staff suggests that an <br /> S:\PLANNING\Case Files\CU 02-04 Sterling Bank\CU02-04_PC.DOC <br />