Laserfiche WebLink
Ms. Michele McPherson • <br /> November 20, 2001 <br /> Page Three <br /> pad shown. If a home is built large enough to fill the entire pad, during a 100-year <br /> storm this residence would have water 10 feet outside their back door. Some <br /> modification to the drainage plan or a restriction on the house pad for this lot and any <br /> others in a similar situation should be made to make the minimum distance from a <br /> 100-year flood to a residence 20 feet. <br /> There is also a question that needs to be addressed relative to the existing culvert <br /> under Fillmore Street and the high water level predicted. The 897 high water level <br /> appears to back up through the existing culvert and potentially endanger an existing <br /> residence on the east side of Fillmore Street. More detailed information will have to <br /> be submitted proving that there will be no backup of the flood elevation from Park <br /> Pointe endangering any existing residences off of the project site. <br /> • In an effort to minimize tree removal from the site, there are some locations where <br /> drainage from one lot across another will not follow normally prescribed easements <br /> around the perimeter of the lots. In these locations, additional easements will need <br /> to be provided on the final plat. <br /> • The relatively steep street connection to Eagle's Marsh causes a couple of difficult <br /> lots to build on, namely Lots 1 and 2, Block 4. Currently, the types of houses shown <br /> would be tuck-under garages with relatively steep back yards ending in a retaining <br /> wall with a maximum height of 12 feet. This is an undesirable situation. We will • <br /> continue to work with the Developer to try to find a compromise that makes a more <br /> attractive lot for construction of a residential home. <br /> • There are a number of islands shown in the cul-de-sacs and other locations <br /> throughout the plat. City staff from the Public Works Department is currently trying to <br /> develop standards for these types of islands to ensure that they do not compromise <br /> snow-plowing activities or emergency vehicle access. Once the standards are <br /> developed, all of the proposed islands will either have to meet these standards or be <br /> eliminated. <br /> C. UTILITY PLAN <br /> • This development is currently in the City's Urban Service Area but is shown in the <br /> City's Comprehensive Plan as obtaining sanitary sewer and water services no earlier <br /> than 2007. In order to develop this plat at this time, a Land Use Amendment will be <br /> required to allow this development to move forward prior to 2007. <br /> • In order to provide sanitary sewer and water services to this site, it will need to be <br /> extended along 175th Avenue from the intersection of Twin Lakes Road. This can <br /> be accomplished with the planned upgrade of 175th Avenue in 2002. City Council <br /> will need to deal with this issue and determine if the Developer will need to petition <br /> for these improvements and what portion of the improvements up to the entire cost <br /> will be borne by the Park Pointe development. <br /> • The preliminary layout of sanitary sewer in the development calls for a lift station to <br /> service the easterly portion of the plat. This is necessary prior to deeper gravity • <br /> sanitary sewer being extended to this portion of the plat from the north. The layout of <br /> the sewer and the location of the lift station needs to be re-evaluated in an effort to <br /> Howarc R. Green Comoany <br /> Ltr 11-19-01 McPherson.rev CONSULTING ENGINEERS <br />