Laserfiche WebLink
10/18/01 THU 08:30 FAX 612 339 4990 ERG 0 009/003 <br /> Page 2 <br /> October 18, 2001 <br /> • new tank including connections to existing leachate piping for cell 11 and the loadout facilities <br /> should be provided with the construction plans. <br /> Landfill Gas System — There are.at least six LEG extraction wells within the fill limits of cell <br /> DC-3. The engineering design report indicates that the wells will be extended vertically as the <br /> filling progresses. Demolition wastes must be placed carefully to ensure that the wells are not <br /> damaged. <br /> I reviewed the CUP for items that might warrant change. If the council authorizes the requested • <br /> amendment, the language in section 2.) (03) (b) should be modified. The reference should be <br /> changed to read: 'The demolition debris landfill cell DC-3 shall be located and operated as <br /> shown on the June 2001 Permit Application and August 2001 revisions submitted by the <br /> Permitee and reviewed by City Staff." I did not see the need to change any of the other specific <br /> conditions in the CUP. Other issues for WMI and the landfill can be addressed within the <br /> existing framework of the CUP and License. <br /> Please contact me if you have additional questions or comments. My direct dial phone number <br /> at ERG is 612-339-2316. Thank you. <br /> Sincerely, <br /> �• ironm tal s; ceGroup, LLC <br /> ir <br /> Matthew L. Ledvina, P.E. <br /> Project Manager <br /> Cc: Dave Lucas, Sherburne.County Zoning <br /> • <br /> G'\Clients\Client A LCCity of Elk RIver\CER2000-020\Con1Letters 2001Ut011018,doc <br /> 111 <br />