Laserfiche WebLink
41_5592 <br /> • (c) Each instance of off hour acceptance has received the prior approval <br /> of the City Building and Zoning Administrator and such approval <br /> was granted during City business hours; and <br /> (d) Each instance of off hour acceptance is documented in a letter sent <br /> by the Landfill to the Building and Zoning Administrator within five <br /> business days of the instance of off hour acceptance. <br /> 7.) Site Environmental Monitoring. <br /> (01) On-site Groundwater. The Permittee shall perform on-site water quality <br /> testing at the monitoring wells in the manner required by the MPCA permit. The <br /> wells shall meet current Department of Health Well Code Standards. The Water <br /> Quality Report shall be submitted to the City when it is submitted to the MPCA. <br /> (02) Surface Water Quality. The Permittee shall have surface water quality <br /> tests performed in conjunction with sampling quarterly events when water is <br /> present. <br /> (03) Off-Site Groundwater Quality. The Permittee shall annually sample the <br /> individual private wells identified in the Phase IV Water Quality Monitoring Work <br /> ill Plan required by section 4(05). All private wells shall be analyzed for pH, COD, <br /> ammonia, chlorides, specific conductance, and volatile organic compounds <br /> (MDH method 465C and EPA method 601, 602). <br /> (04) Modification. The testing programs specified in this Section 7 may be <br /> modified by City staff if City staff reasonably determines there exists a need for <br /> additional wells to be tested or additional parameters to be analyzed, based upon <br /> water or air quality test results indicating the presence of contamination. <br /> 8.) Hvdrogeologic Reports. The investigation of the hydrological and <br /> geophysical characteristics of the site shall be continued and any other new <br /> information relating to the hydrogeologic impact of the site shall be reported to <br /> the City . Hydrogeologic reports shall be updated, amended, and modified as <br /> warranted by newly discovered or additional data acquired in the continued <br /> hydrogeologic investigation. The Permittee shall also notify City at least two (2) <br /> days in advance of any soil boring or well construction required by this Permit. <br /> 9.) Dust, Noise, and Odor. Fugitive dust emissions off-site shall be controlled <br /> at the Landfill site as necessary by undertaking the following: road surfaces <br /> within the Landfill Site shall be wetted with water or an appropriate chemical <br /> whenever off-site dust levels become unreasonable as determined by the City <br /> Zoning Administrator. Dust pollutives shall be utilized to the extent necessary <br /> 4111 on cover material such as stockpiles to reduce wind erosion as well as on other <br /> exposed surfaces as appropriate. Cover compaction and revegetation activities <br />