Laserfiche WebLink
Ms. Michele McPherson <br /> • <br /> August 31, 2001 <br /> Page Two <br /> t The storm sewer shown on the preliminary grading plan is different than the storm sewer <br /> shown on the preliminary landscape plan. We believe that the preliminary grading plan is <br /> correct. Therefore, the preliminary landscape plan should be revised to reflect the correct <br /> storm sewer alignment. <br /> r Since the entire site is void of trees, additional grading should be shown where necessary to <br /> ensure that drainage from one lot to the other follows the drainage and utility easements <br /> around the perimeter of the lots. <br /> The preliminary grading plan does reflect a two-foot high berm along the frontage with CSAH <br /> 35. <br /> C. Miscellaneous <br /> i> Pascal Street is currently a gravel roadway. We would recommend that as a condition of the <br /> plat, the developer pave Pascal Street approximately 325 feet from CSAH 35 to the <br /> intersection of the entrance to the plat. <br /> • If you have any questions regarding any of these comments, please call. <br /> Sincerely, <br /> Howard R. GreenCompany <br /> y <br /> Terry J. Maurer, P.E. <br /> • <br /> Howarc R. Green Company <br /> Ltr-083101-McPherson.doc CONSULTING ENGINEERS <br />