• opposite the main access to Elk River Crossing off of Tyler Street. In fact, at this location <br /> the median is not only broken but a left turn lane into the Trott Brook Farms South property <br /> is already constructed. <br /> The internal road system provides two access points to the property immediately to the <br /> south. One is approximately 200 feet off the east boundary, and the other is <br /> approximately 450 feet away from Tyler Street. These should provide adequate road <br /> access for an internal circulation as the property to the south develops. <br /> 3. The Grading, Drainage, and Erosion Control Plan submitted is at a scale of 1"=100'. It is <br /> very difficult to do a detailed review on a project this size at that scale. We would <br /> recommend that the Developer submit a 50-scale grading plan. <br /> Generally, the items we noted in the review of the small scale Grading Plan is additional <br /> elevations need to be added to indicate the tops of ponds and overflow elevations to <br /> determine that storm drainage will not endanger any of the buildings. There are also <br /> significant areas where the yard drainage does not follow rear lot lines. In these areas <br /> additional easements will need to be granted on the final plat. There is also a significant <br /> amount of storm sewer piping along rear lot lines. In some instances, simply regarding the <br /> area could eliminate this pipe. In other areas, the main line storm sewer should follow the <br /> street rights-of-way with catch basins and leads into the rear yard areas. <br /> A more detailed drainage review will be possible when a larger scale Grading Plan is <br /> submitted. <br /> 111 4. There is a fairly sizable wetland located in the north central portion of the site. Portions of <br /> the wetland are proposed to be filled for construction of roads and other grading on the <br /> site. No wetland delineation was provided with the submittal package. However, it does <br /> appear that a delineation has been done. This project will need to go through a Technical <br /> Evaluation Panel. The wetland process will need to be concluded prior to any final <br /> approvals for this project. <br /> 5. Review of the drainage calculations indicates that in concept the design is reasonable. <br /> However, there are a number of significant issues that will require the storm sewer design <br /> to be redone and possibly the ponding areas enlarged. Specifically, the calculations allow <br /> 12.9 cubic feet per second to discharge from the site after development. In reviewing the <br /> storm drainage calculations for the Tyler Street trunk system, there is only 4.9 cubic feet <br /> per second allowable from this site. There are also some minor issues with the tops of the <br /> ponds versus the high water elevation of the ponds. The storm sewer model does not <br /> indicate enough freeboard between the high water elevation and the top of the pond. We <br /> will work with the Developer's engineer to revise the storm sewer calculations. <br /> 6. The sanitary sewer system to serve the proposed development consists of an extension <br /> from the trunk line in Tyler Street at the southwest corner and laterally sized sewer lines <br /> throughout the development. Water service for the proposed development will consist of a <br /> connection to a stub constructed by the Elk River Municipal Utilities near the northwest <br /> corner of the development, off of the high pressure portion of the water system. The water <br /> lines are looped through the development. The second connection will be further east <br /> along CSAH 12 near the main entrance to Trott Brook Farms. The Utility Plan for Trott <br /> • <br /> Brook Farms South shows the watermain terminating at their east boundary near CSAH <br /> 12. In fact, the extension over to the stub across CSAH 12 will need to be made at this <br /> Howard R.Green Company <br /> Ltr 8-22-01 McPherson.rev CONSULTING ENGINEERS Page 2 <br />