Laserfiche WebLink
Memo to Planning Commission/L&W LLC (Deano's Collision) <br /> August 286,2001 <br /> Page 2 <br /> ______ <br /> III the present use of an auto repair business. In May of 1997, L & W LLC was granted a <br /> conditional use permit to operate an auto body repair and to construct a second principal <br /> building on the site. <br /> Overview <br /> The request consists of a 7,200 sq. ft. building expansion and a new entrance canopy <br /> attached to the existing building. The site currently has two buildings on the property;the <br /> Precision Frame &Alignment building at 5,525 sq. ft. and Deano's Collision building at <br /> 7,200 sq. ft. The proposed building expansion would be attached to the existing Deano's <br /> Collision building and be occupied by Deano's Collision. <br /> Design Standards <br /> The proposed building materials,concrete block and metal panel,do not meet the current <br /> commercial standards, which state that a minimum of seventy-five percent (75%) of the <br /> exterior building finish shall consist of materials comparable in grade and quality to those <br /> listed in the ordinance (face brick,natural stone,glass,wood,stucco,aluminum lap siding, <br /> masonite,vinyl and specially designed precast concrete units or integrally treated and/or <br /> textured concrete block.) <br /> Landscaping <br /> • The submitted landscape plan shows perimeter plantings around the entire property. There <br /> appears to be adequate amounts of plantings along the north and west property lines, <br /> however,along Vance Street there should be more landscaping and/or berming to screen <br /> the outdoor storage of vehicles. <br /> Parking and Circulation <br /> Based on the square footage of the expansion and the city's requirement of one parking stall <br /> for every 300 sq. ft., a total of 66 parking stalls would be required on site for all three <br /> buildings. The proposed layout exceeds this requirement with a total of 96 total stalls. A <br /> minimum 10'setback from the property line is also maintained. <br /> The proposed layout provides a second access to the site off of Vance Street. <br /> Three handicap parking stalls are required for the three buildings. The submitted site plan <br /> shows only two stalls. One additional handicap parking stall shall be required for the <br /> Deano's Collision building. <br /> Sewer and Water <br /> The existing buildings are currently on their own septic system and the building site is within <br /> • the Urban Service District. With the building expansion,they will be required to connect to <br /> sanitary sewer and water. <br /> S:\PLANNING\Chris L\CU01-30.DOC <br />