Laserfiche WebLink
Mr. Steve Wensman <br /> III November 22, 2000 <br /> Page Three <br /> ■ No utility plan has been provided. We have discussed this with the developer. In the <br /> past, this developer has opted to use the City Engineer to prepare plans and <br /> specifications for construction. He has done this by placing an escrow with the City for <br /> the work to be accomplished. If this is the same approach to be used on Hillside Estates <br /> 8th Addition, there is no need to submit a utility plan. Sanitary sewer will be simply an <br /> extension of the existing facilities, along with watermain. There will be perhaps one <br /> trunk-sized watermain constructed through this development. Its actual alignment will be <br /> determined based on the phasing of the subdivision. <br /> • All drainage and utility easements should be shown on the preliminary plat. <br /> If you have any questions regarding any of the comments, please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J. Maurer, P.E. <br /> III <br /> • <br /> Ltr-112200-Wensman.doc Howard R. Green Company <br /> CONSULTING ENGINEERS <br />