My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.2. SR 07-02-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
07-02-2018
>
10.2. SR 07-02-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 4:41:53 PM
Creation date
6/28/2018 4:34:42 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.27.2018 Oak Knoll Athletic Complex-Existing Facility Improvements Draft Costs for Discussion Purposes-Based on Planning Level Estimates-Subject to Change <br /> Category Item Unit Count Cost Per Unit Total Cost Notes <br /> Trails Paved Trail LF 1,247 $ 60.00 $ 74,820.00 10'Bituminous With Subgrade <br /> Water Allowance for Utilities Extension LS 1 $ 75,000.00 $ 75,000.00 Approximately 700-1000'based on access <br /> Parking Lot Base and Bituminous SF 35,388 $ 5.00 $ 176,940.00 0 <br /> Parking Lot Curb and Gutter LF 1,345 $ 25.00 $ 33,625.00 0 <br /> Landscaping Trees EA 19 $ 500.00 $ 9,500.00 0 <br /> Fields Field Enhancements-Existing Turf EA 2 $ 20,000.00 $ 40,000.00 Turf restoration,minor maintenance of fencing and structures <br /> Fields Field Enhancements-Baseball-Existing-340' EA 1 $ 25,000.00 $ 25,000.00 Turf restoration,minor maintenance of fencing and structures <br /> Fields Field Enhancements-Baseball-Existing-240' EA 1 $ 20,000.00 $ 20,000.00 Turf restoration,minor maintenance of fencing and structures <br /> Lighting Lighting for Full Size Baseball Field EA 1 $ 253,000.00 $ 253,000.00 (8)poles with field lit to 50 footcandles infield and 30 footcandles outfield <br /> Lighting Lighting for Youth Baseball Field EA 1 $ 115,500.00 $ 115,500.00 (4)pole system with infield lit to 50 footcandles and outfield lit to 30 footcandles; <br /> Structures Restrooms SF 400 $ 400.00 $ 160,000.00 0 <br /> Structures Concessions SF 400 $ 400.00 $ 160,000.00 0 <br /> Structures Batting Cages EA 2 $ 15,000.00 $ 30,000.00 0 <br /> Structures Bleachers EA 2 $ 10,000.00 $ 20,000.00 0 <br /> Signage Signage Package Allowance EA 1 $ 50,000.00 $ 50,000.00 Allowance for signs as developed through the Elk River Signage Project <br /> Total 1$ 1,243,385.00 <br /> Contingency 10% $ 124,338.50 <br /> Total after Contingency 1$ 1,367,723.50 <br /> Design and Engineering 18% $ 246,190.23 <br /> Total after Design and Engineering $ 1,613,913.73 <br /> Additional Upgrades <br /> Grandstands,Amenities and Ballfield $ 3,000,000 <br /> Synthetic Turf Field $ 1,250,000 <br /> Seasonal Dome $ 6,000,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.