Laserfiche WebLink
<br />~I1 in the City Hall. The concensus of the Council, at that meeting, was <br />to engage the firm of CH2M-Hill for preliminary engineering work in <br />conjunction with the repair of reconstruction of the Orono Lake Dam. <br />C01.JNCIU1A.1IJ ENGSTROtvI MOVED THAT T'riE ENGINEERING FIRM OF CH2M-HILL BE <br />ENGAGED TO PERFORI0: PRELIHINARY ENGINEERING \~OPJ( ON THE ORONO LAKE DAM, <br />AS PROPOSED BY THE ENGllJEERING FIRM, iHTH COST FOR A PHASE I STUDY NOT <br />TO EXCEED $8,000 AND COSTS FOR THE PHASE II PORTION OF THE STUDY NOT TO <br />EXCEF.ill $18,000. IJlOTION SECONDED BY COUNCILMAN DUITSrtiAN. HOTION PASSED <br />4-0. <br /> <br />COUNCILMAN ENGSTROM MOVED THAT THE HEETllJG BE ADJOUR.\i'ED. MOTION <br />SECO~l)ED BY COUNCIU"J,.N OTTO. MOTION PASSED 4-0. <br /> <br />Meeting Adjourned. <br /> <br />Respectful:y Submitted, <br />A '4 <br />6lL.~~ <br /> <br />Robert C. Hiddaugh <br />City Administrator <br /> <br />'------....,\ <br />