My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. BASR 05-22-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2018
>
05-22-2018
>
5.3. BASR 05-22-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2018 10:07:20 AM
Creation date
5/18/2018 10:05:31 AM
Metadata
Fields
Template:
City Government
type
BASR
date
5/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bryan and Jessica Provo <br />19383 Zumbro Court <br />Elk River, MN 55330 <br />4/30/18 <br /> <br />Narrative <br />To Whom it may concern: <br />Project Scope <br />The purposed project at 19383 Zumbro Court (Nordic Hills) is a inground pool with landscaping. The <br />installer would be Nassau Pools in Elk River and is scheduled to be installed in June of 2018. The pool <br />size is 18’ x 30’ and would be up to date with all the latest safety and ecofriendly technology. The project <br />would include appropriate landscape, cement work and fencing to support safety and ascetics of the <br />neighborhood. <br />Request <br />We are requesting the following: <br />1)Vacation of a Drainage and Utility Easement <br />The purpose of the easement vacation is to allow not the pool but the landscaping and pool deck to <br />have a safe amount of space around the edges of the pool. The proposed project would not encroach <br />the actual wetlands or water table, just the man-made boundary. <br />2)Variance on the “Wet Land” Buffer (see below Sec.30-1852 ) <br />Sec. 30-1852. - Performance standards. <br />(a) Wetland buffer strip. A minimum 25-foot buffer strip from the delineated boundary of a <br />wetland or ordinary highwater level of a storm water pond is hereby established. Wetland <br />buffer strips shall meet the following standards: <br />i. No principle or accessory structures, patios, paving, or other impervious surfaces <br />shall be permitted within the wetland buffer strip. <br />(b) Wetland buffer strip setback . A minimum 20-foot setback from wetland buffer strips (45 <br />foot total setback) is hereby established by the city. <br />i. No principle or accessory structures, patios, paving, or other impervious surface shall <br />be located within this setback. <br />
The URL can be used to link to this page
Your browser does not support the video tag.