My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3. SR 05-21-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
05-21-2018
>
9.3. SR 05-21-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 12:34:52 PM
Creation date
5/18/2018 9:39:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/21/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Conference room remodel, goal is enlarging the existing room and create a hallway. <br />Demo labor, Dumpster, carpenters, electrical, plumbing, heating sheet rockers, tapers Painters, Material <br />suppliers, him carpenters, flooring <br />• Demo walls interior walls of conference room and wet bar wall in hallway. <br />• Frame in new wall to accommodate a new hallway and door opening into conference room. <br />• Wire for new light switches for conference room and three-way switch for hallway, outlets and install light <br />fixtures. <br />• Sheetrock, tape, sand and spray ceilings <br />• Install 6' oak full glass double door into conference room with oak Princeton casing and base. <br />• Stain and varnish doors and trim, paint walls <br />• Install carpet in conference room and vinyl flooring in hallway. <br />Total for all above project $17,466.00 <br />3. Window and door replacement <br />Window supplier, dumpster, carpenter, sheet rocker, painter and sider <br />• Lower level entry door, 3-0 right hand, steel door with Aluminum frame, full light with double bore <br />• Replace 6-0 patio door on upper level with a 6' window. <br />o Remove door <br />o Frame in window opening <br />o Install window <br />o Install window wrap and flashing <br />o Patch in siding <br />o Insulate <br />o Patch sheetrock and tape <br />o Paint and stain jambs, casing and Base <br />• 2 -Upper level entry door, 3-0 right hand, steel door with Aluminum frame, full light with double bore <br />• Replace 2- 6' three wide window with a vinyl casement window <br />• Replace window in Debbie's office with a vinyl glide <br />• Replace 3- single wide double hung window with vinyl double single hung <br />Total for all above project $13,860.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.