My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-1981 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
1980-1989
>
1981
>
11-16-1981 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:49 AM
Creation date
4/19/2005 2:21:54 PM
Metadata
Fields
Template:
City Government
type
CCM
date
11/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />Page Six <br />November 16,1981 <br /> <br />11. Greenhead Acres 3rd Addition Pay Estimate and Cost Overrun <br /> <br />The City Administrator indicated that an error had been made by Consulting Engi- <br />neers Diversified in the specifications for the Greenhead Acres 3rd Addition pro- <br />ject for the tree and stump removal. The City Administrator explained that the <br />specifications called for clearing and grubbing trees per tree, with an estimate <br />of 30 trees clearing and grubbing and 30 trees grubbing. Mr. Jeff Roos, of Con- <br />sulting Engineers Diversified, indicated that the specifications were written on <br />a per tree basis as an honest attemp to reduce the cost on the project. Mr. Roos <br />.indicated that Mr. Lloyd Anderson had informed Consulting Engineers Dive~sified <br />that many trees had already been cut in thep~oject and, as they reviewed the site <br />for trees and stump removal, it was impossible to judge the actual street limits:. <br />Therefore, it was Consulting Engineers decision to put a large enough quantity in <br />the specifications to assure a legitimate'"1.mit price.. Mr. Roos indicated that the <br />discussions with Mr. Lloyd Anderson had been held regarding the overrun cost for <br />the tree and stump removal and Consulting Engineers Diversified has agree to credit <br />$5,700 of their fee to the City of Elk River. Mr. Roos indicated that in their con- <br />versations with Mr. Lloyd Anderson, Mr. Anderson indicated that he did not want the <br />controversy to become a legal matter and that Consulting Engineers Diversified made <br />their offer of a reduction in fees in good faith. Mr. Roos further indicated that <br />Mr. Anderson, at this point, is not satisfied with the offer and has indicated that <br />he will meet with his attorney regarding the controversy of the cost overrun. Mr. <br />Roos indicated that Consulting Engineers Diversified would try to release the City <br />from any legal action should legal action be required. <br /> <br />Mr. Lloyd Anderson indicated that he felt Consulting Engineers Diversified made a <br />mistake in requesting that the project be bid on a per tree basis rather than a per <br />acre basis, and further indicated that he felt it was inconceivable that Consulting <br />Engineers Diversified should estimate that there would only be sixty trees to be <br />removed in the project. Mr. Lloyd Anderson indicated that he felt there is a <br />$42,000 cost estimate mistake, and further indicated that he does not feel he, the <br />developer, should pay for this mistake. Mayor Hinkle questioned how many acres were <br />in the project if the tree removal was bid on a per acre basis. Mr. Lloyd Anderson <br />indicated that he felt he had six acres and Consulting Engineers Diversified be- <br />lieved there were 12 acres, and further indicated that he believed the trees and <br />stumps removed should have been done at a fee of approximately $800 per acre to <br />$1,500 per acre;~ <br /> <br />Mr. Lloyd Anderson indicated that his attorney indicated that the City could not <br />be released from any legal action should legal action be required to solve the <br />controversy. General discussion was carried on between the City Council, Mr. Jeff <br />Roos of Consulting Engineers Diversified, and Mr. Lloyd Anderson, the developer of <br />Greenhead Acres 3rd Addition, regarding the wording of the contract on the trees <br />and stump removal of a cost per tree versus a cost per acre basis. <br /> <br />The City Administrator indicated that the second pay estimate, in the amount of <br />$56,107.74, did include the change order for the tree removal overrun costs. <br />General discussion was carried on regarding the number of trees actually removed in <br />the project. Mr. Terry Mauer indicated that the pay estimate does include the <br />actual amount of trees removed and grubbed. Councilman Toth indicated that he <br />
The URL can be used to link to this page
Your browser does not support the video tag.