• <br /> Explanation of Request <br /> Permit Modification <br /> The Elk River Landfill, Inc. (ERL) is permitted by the MPCA and also has a City of Elk <br /> River License and Conditional Use Permit. We have submitted a permit modification <br /> request,which improves the design of the facility and provides for a more efficient <br /> leachate collection system and more efficient use of the designated landfill footprint. <br /> Detailed information can be found in the permit modification engineering report and <br /> plans. In general the major design improvements include the conversion from gravity <br /> leachate collection lines which drained to the leachate storage tank,to leachate lines <br /> which drain to an internal sump pump from which leachate is pumped to storage tanks <br /> via a force main. <br /> The improved design does not include an increase in footprints, nor does it include an <br /> increase in the ultimate capacity of the facility. The design now incorporates an earth <br /> berm along the western and southern portion of the landfill footprint. The berm allows for <br /> • more efficient use of landfill airspace and also allows for an increased visual screen along <br /> the western and southern sides of the facility. Because of the footprint required for the <br /> berm, the number of landfill cells decreases from 18 to 17. <br /> The modified design also changes the final cover slope from 5:1's to 3:1's and includes <br /> the use of"benches" in the final contour plan and the use of a geonet drainage layer in the <br /> final cover system. The benched final contour plan is very similar to a farm field terrace <br /> system concept, which is often used to minimize erosion. The benches provide a break in <br /> surface water flow and also offer excellent access to the upper portions of the landfill. <br /> During review of the 3:1 slopes and the cover components, detailed engineering analysis, <br /> including slope stability review, surface water control and erosion control, was <br /> completed. Three to one slopes are successfully used at other landfill facilities across the <br /> nation. Please refer attached plan sheets for detailed information. <br /> Leachate recirculation <br /> The second project under consideration is leachate recirculation. Currently leachate from <br /> the facility is trucked over 60 miles to the wastewater treatment plant in St. Paul. The <br /> leachate recirculation project proposes to treat leachate on-site through a series of <br /> perforated pipes laid in trenches at 30-foot height intervals within the active landfill cell. <br /> • Leachate will be force mained into the pipes at timed intervals and allowed to saturate the <br />