Laserfiche WebLink
(01) Permittee shall pay one hundred percent (100%) of the City's costs <br /> • <br /> for processing renewals, amendments or proposed amendments to <br /> this Permit; and <br /> (02) Permittee shall pay one hundred percent (100%) of the City's costs <br /> for administering and enforcing the terms of this Permit, including <br /> costs for reviewing Permittee's compliance with the terms and <br /> conditions of this Permit, costs for bringing Permittee into <br /> compliance with the terms and conditions of this Permit (including <br /> legal costs); and City costs incurred for review of Permittee initiated <br /> requests such as "co-disposal" approvals, etc. <br /> 18.) On-Site Inspection. The City may inspect the Landfill Site for the <br /> purposes of examining and copying nonconfidential records; conducting <br /> inspections, surveys, investigations, monitoring, or sampling; and otherwise <br /> obtaining necessary information pertaining to the construction, operation, and <br /> environmental effect of the disposal facility, control equipment, and control <br /> materials. Inspections shall be conducted during normal business hours except <br /> in the event of an emergency. City personnel or agents performing the <br /> inspection will notify personnel at the landfill office at the time of inspection. <br /> Permittee shall promptly notify the City of the name of an authorized person to <br /> be notified and provide access to the Landfill in case of emergency. The City <br /> shall be notified by the Permittee immediately upon the occurrence of any <br /> explosion, fire, or other emergency at the Landfill; upon the discovery, release or <br /> spill of the hazardous or dangerous materials, as defined in the City of Elk River <br /> Solid Waste Ordinance, at the Landfill; and of any violations of the conditions of <br /> this Permit. The specific requirements for how, when and who to notify at the <br /> City shall be set forth in a separate letter from City staff to Permittee. This letter <br /> may be revised or supplemented by City staff from time to time as necessary to <br /> address the City's needs for notification. <br /> 19.) Indemnity. The Permittee shall indemnify, defend, and hold the City <br /> harmless from all claims, demands, and/or actions, legal and/or equitable <br /> arising from the operations on the Landfill Site. <br /> 20.) Workers Compensation. The Permittee shall carry in a company <br /> authorized to transact business in the State of Minnesota a policy of insurance <br /> fulfilling all requirements of the Worker's Compensation Act, including all legal <br /> requirements for occupational diseases, or self-insure for the above. <br /> 21.) Split Samples. The Permittee shall notify the City forty-eight (48) <br /> hours before any sampling of groundwater or surface water and allow the city to <br /> obtain split samples of such waters. <br /> • 22.) Right to Require Performance. The failure of the City, at any time, to <br /> require performance by the Permittee of any provisions hereof shall in no way <br />