Laserfiche WebLink
disposed at the Landfill and those substances which may not be accepted for <br /> • disposal. <br /> (16) Sanitary Facilities. Adequate sanitary facilities and shelter shall be <br /> provided for site personnel. <br /> (17) Electrical Service. Adequate electrical service shall be provided at the site <br /> for operations and repairs. <br /> (18) Fire Fighting. Fire fighting equipment including at least one piece of <br /> heavy equipment, fire extinguishers in all machines working in the Landfill, and <br /> a water truck shall be kept available on the site during the active life of the <br /> Landfill. The self-contained breathing apparatus purchased for the City Fire <br /> Department shall be available at the Fire Department for use by permittee on a <br /> temporary basis, as approved by the Fire Chief. Permittee shall make a landfill <br /> operator available at the request of the City Fire Chief to consult and advise the <br /> fire department about landfill fire fighting issues. <br /> (19) Safety Equipment. Emergency first aid equipment consisting of at least <br /> one first aid kit kept near the working face, and at least one shower on site <br /> available to all personnel and customers shall be supplied. At least one of every <br /> four landfill personnel shall be trained in first aid and CPR. <br /> • (20) Water. A potable water supply shall be available for site personnel. <br /> (21) Storage. Adequate on-site shelter shall be provided for maintenance and <br /> storage, sufficient to supply the equipment required by subsection (19) of this <br /> section, during cold weather operations. <br /> (22) Vehicle Stacking Facilities. Adequate vehicle stacking facilities shall be <br /> provided to ensure that no vehicle desiring entry into the site shall have to wait <br /> outside the perimeter of the Landfill Property. <br /> (23) Communication. Adequate communication facilities shall be provided for <br /> emergency purposes. <br /> (24) Security. A gate shall be provided at the entrance to the site and kept <br /> locked when an attendant is not on dut <br /> (25) Haul Roads. An all-weather haul road shall be provided to the unloading <br /> area and watered on a regular basis. The Landfill shall pave the access roads <br /> from T.H. 169 to the scale and from T.H. 169 to the shop building by June 30, <br /> 1997 to reduce dust generation. <br /> (26) Adequate Equipment. Adequate equipment shall be supplied capable of <br /> • spreading and compacting the refuse as received. At least one machine capable <br />