Laserfiche WebLink
demolition debris upon written notice from the City that there is a <br /> violation of this condition. 411 <br /> (04) Other Related Operations. No other operations or activities, whether or <br /> not related to the Landfill, shall be permitted or allowed on the Landfill Property <br /> unless this Permit is first amended to specifically allow such operations and to <br /> specify the applicable conditions, except mining activities or other operations <br /> licensed or permitted separately by City. <br /> 3.) Buffer Zone/Screening A Buffer Zone shall be established within the <br /> perimeter of the Landfill Property around the waste disposal areas of not less <br /> than 200 feet, except on the north side. Within this Buffer Zone, no waste <br /> disposal may occur. Permittee shall place a six (6) foot high earth berm, <br /> landscaped with evergreen trees and protected from erosion within the Buffer <br /> Zone. Where the Buffer Zone contains heavily wooded areas, an exception to <br /> installing the berm and landscaping shall be allowed. A plan for establishment <br /> of the Buffer Zone shall be submitted to the City no later than July 1, 1997 for <br /> approval by City staff and shall be implemented as provided in the plan. The <br /> Landfill shall develop an inventory of significant trees within the buffer <br /> zone. The preservation of trees within the buffer zone shall be included in <br /> plans for construction, operation, and closure of the Landfill. Said plans <br /> shall be in compliance with the screening plans dated, May 28, 1999, which <br /> are incorporated into Sherburne County's license for the Landfill. • <br /> 4.) Specific Additional Operational Requirements. <br /> (01) Leachate Transmission Pipes. Permittee shall verify to the City every four <br /> (4) years that the existing leachate transmission pipes do not leak. <br /> (02) Backup Leachate Pumps. Permittee shall maintain backup pumps for use <br /> in the event of pump failure at the wet well and leachate storage tank on-site, or <br /> shall maintain provisions for restoring temporary leachate pumping within a 24- <br /> hour period. <br /> (03) Leachate Holding Tank. Permittee shall ensure that the leachate-holding <br /> tank is pumped out on a regular schedule. It shall be a violation of this Permit <br /> to allow leachate to collect on the liner to a depth exceeding one foot due to the <br /> leachate-holding tank being full. <br /> (04) Gas Venting System. Permittee shall conduct active landfill gas venting in <br /> accordance with approved plans and shall construct additional phases of the <br /> venting system at the time of final cover construction. <br /> (05) Comprehensive Monitoring Plan Phase IV Water Quality Monitoring <br /> Work Plan. The Comprehensive Monitoring Plan Phase IV Water Quality . <br /> Monitoring Work Plan which describes the sampling frequency, parameters, <br />