Laserfiche WebLink
collectively describe the Waste Burning Facility authorized by this Permit. 410Construction or operation in violation of any of the material statements of <br /> fact, factual information, or representations in the referenced documents <br /> shall be deemed to be a violation of this Permit and all such documents are <br /> considered to be and are hereby made a part of this Permit. <br /> 2. Building construction, driveways,parking, grading, utilities, surface water <br /> management, erosion control, landscaping, fencing, and screening for the <br /> Facility shall be provided substantially in accordance with the plans <br /> submitted by the Permittee and hereby made a part of this Permit. <br /> 3. All utility and street construction plans and specifications as presented by <br /> the Permittee for the Facility and servicing streets must be prepared by a <br /> Registered Civil Engineer in accordance with directions of and as <br /> approved by the City Engineer. <br /> 4. All building plans and specifications must be approved by the City <br /> Building Inspector and Fire Chief <br /> 5. Approval of driveway entrances or exits, if needed, on State and County <br /> highways shall be secured from the appropriate agencies and filed with the <br /> City Zoning Administrator prior to issuance of any building permit. <br /> 6. The City shall have the right of access to the Facility and site. The City • <br /> need not give prior notice to the Permittee for designated personnel to <br /> access the Facility or site during the hours of 6:00 a.m. to 6:00 p.m., <br /> Monday through Saturday, or if any emergency occurs. At any other time, <br /> at least twelve (12) hours prior notice to the Permittee is required. Such <br /> access shall be in accordance with the Permittee's safety standards and <br /> proprietary information requirements, and shall not interfere with the <br /> Permittee's ability to perform its contractual obligations. <br /> 7. All employee or visitor motor vehicles associated with Facility operation <br /> shall be parked on Facility property or on adjacent property owned by the <br /> Permittee, but not on adjacent lands not owned by Permittee or on <br /> adjacent streets. Adequate facilities must be provided to ensure that no <br /> vehicle delivering RDF to the Facility will have to wait outside the <br /> perimeter of the Facility site. <br /> 8. The City shall be notified by the Permittee immediately upon the release <br /> or spill of hazardous materials at the Facility; and of any violations of the <br /> conditions of the Permit, Air Emission Facility Permit No. 147A-86-OT-1 <br /> 1410000-0003, or Permit for a Waste Processing Facility and System,No. <br /> SW-305 and NPDES Permit No. MN001988. <br /> • <br /> 2 <br />