of Elk River Concerns" transmitted to Mayor Richard Hinkle on
<br /> August 19, 1986; and (3) correspondence from the Permittee to
<br /> Mayor Richard Hinkle dated October 13, 1986, and as further
<br /> described in Permittee's November 28, 1989, application for
<br /> renewal of conditional us permit and Permittee's correspondence of
<br /> April 2, 1990, April 17, 1990, July 2, 1990, August 3, 1990, and
<br /> September 6, 1990, to the City; in Permittee's November 20, 1991,
<br /> application for renewal of the Conditional Use Permit; in Permitee's
<br /> February 1, 1993, application for renewal of the Conditional Use
<br /> Permit; in Permitee's November 8, 1995, application for renewal of
<br /> the Conditional Use Permit; and in Permitee's November 2, 1999,
<br /> application for renewal of the Conditional Use Permit; all of which
<br /> have been provided to the City by the Permittee in support of the
<br /> application for this Amended Conditional Use Permit and
<br /> collectively describe the Facility authorized by the Permit. The
<br /> Facility consists of three (3) integrated components located in the
<br /> City: (1) A facility for receiving municipal solid waste and
<br /> processing it into refuse-derived fuel (Processing Facility); and (3)
<br /> The movement of vehicles transporting municipal solid waste
<br /> (MSW), refuse-derived fuel (RDF), rejected municipal solid waste
<br /> (Rejects), and incineration residue (Residue). So long as RDF is
<br /> incinerated in the City, the conditions of this Permit which relate to
<br /> the Burn Facility and Residue shall be in full force and effect. •
<br /> Construction or operation in violation of any of the material
<br /> statements of fact, factual information, or representations in the
<br /> referenced documents shall be deemed to be a violation of the
<br /> Permit and all such documents are considered to be and are hereby
<br /> made a part of the Permit.
<br /> 2. Building construction, driveways, parking, grading, utilities,
<br /> surface water management, erosion control, landscaping, fencing,
<br /> and screening for the Processing Facility shall be provided
<br /> substantially in accordance with the plans submitted by Northern
<br /> States Power Company with the original application of a
<br /> conditional use permit and the November 28, 1989 application for
<br /> renewal of conditional use permit, which are herby made a part of
<br /> this Permit. In addition, these plans shall be further revised to
<br /> provide a hard surfaced, diked area to drop hot loads of processed
<br /> RDF so that they can be put out and fire suppression water
<br /> retained; and to further provide that all areas on the facility site
<br /> are either hard surfaced parking and drive areas, pea rock or
<br /> asphalt shavings for equipment storage, or landscaped areas with
<br /> grass. There shall be no gravel or dirt areas on the facility site.
<br /> The revised plans shall be submitted by December 31, 1990, and all
<br /> improvements installed by September 30, 1991. •
<br /> s:\b&z\stever\exhibita.doc 2
<br />
|