My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1999
>
11-23-1999
>
5.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 1:26:52 PM
Creation date
5/7/2018 1:26:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Order a load of MSW inspected, pursuant to the procedures set <br /> 111 <br /> forth in the license for the Facility; <br /> B. Order the Facility cleaned, if a violation of the dust control plan <br /> for the Facility is observed; or <br /> C. Order the Facility shut down if necessary to bring it into <br /> compliance with the dust control plan or any other term or <br /> condition of this Conditional Use Permit, the license for the <br /> Facility, or Section 604 of the City Code. <br /> 7. All employee or visitor motor vehicles associated with Facility <br /> operation shall be parked on Facility property, and not on adjacent <br /> lands not owned by Permittee or on adjacent streets. Adequate <br /> facilities must be provided to ensure that no vehicle desiring entry <br /> into the Processing Facility during permitted receiving hours will <br /> have to way outside the perimeter of the Processing Facility site. <br /> 8. The City shall be notified by the Permittee immediately upon the <br /> occurrence of any explosion, fire, or other emergency at the Facility; <br /> upon the discovery, release or spill of hazardous or dangerous <br /> materials, as defined in the City of Elk River Solid Waste <br /> Ordinance, at the Facility; and of any violations of the conditions of <br /> the Permit, Air Emission Facility Permit No. 147A-86-OT-1 <br /> 1410000-0003 or Permit for a Waste Processing Facility and <br /> System, No. SW-305. The specific requirements for how, when and • <br /> who to notify at the City shall be set forth in a separate letter from <br /> City Staff to Permittee. This letter may be revised or supplemented <br /> by City staff from time to time as necessary to address the City's <br /> needs for notification. <br /> 9. This Permit authorizes an average annual throughput of one <br /> thousand five hundred twenty-six (1,526) tons per day of MSW. <br /> 10. All MSW, RDF, Reject or Residue-hauling truck traffic entering or <br /> exiting the Processing Facility or the Burn Facility shall use only <br /> those highways and streets as allowed in writing by the City <br /> Council, avoiding the use of Main Street and residential streets, if <br /> at all possible. Truck traffic originating in the City may use other <br /> public streets. <br /> 11. The Facility may operate twenty-four (24) hours a day. However, <br /> the City reserves the right to restrict the hours of operation of the <br /> Facility to normal business hours of noise emanating from the <br /> Facility to surrounding residential properties is unacceptable. <br /> Hours of Receiving and transporting MSW and rejects at the <br /> Processing Facility may take place twenty-four (24) hours a <br /> day, shall be limited to 6:00 a.m. to 9:00 p.m., Monday through <br /> Saturday, provided that from 6:00 p.m. to 9:00 p.m. the Facility <br /> may only receive MSW from the Hennepin County transfer station <br /> • <br /> s:\b&z\stever\exhibita.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.