Laserfiche WebLink
Ms. Michele McPherson <br /> • January 16, 2001 <br /> Page Two <br /> • Several of the home sites show rear, lower level elevations that would likely require <br /> some type of retaining wall in order to minimize fill and not have a filling operation <br /> encroach into the large wetland area. When the development plan is prepared and <br /> submitted for this development, these issues need to be addressed. <br /> 3. SHEET 5 OF 12 <br /> • There are several locations throughout this plat where drainage from one lot to the <br /> next does not follow the prescribed easements. This is being done in an effort to <br /> minimize tree loss. In some of these areas, additional easements have been shown. <br /> In some areas they have not been added as of yet. Additional easements will need <br /> to be provided on the final plat in all of these areas. <br /> 4. STORM DRAINAGE CALCULATIONS AND ON-SITE TREATMENT SYSTEM <br /> EVALUATIONS <br /> • We are currently reviewing the storm drainage calculations and on-site treatment <br /> system preliminary evaluations that were submitted with the preliminary plan set. <br /> We will provide detailed comments regarding these two issues when the reviews are <br /> complete. <br /> 1111 5. 221st AVENUE <br /> 221st Avenue is currently gravel surfaced. We are working with the Developer to <br /> determine a "fair share" cost for their portion of a bituminous surfacing project together <br /> with the potential timing of such a project. <br /> If you have any questions regarding these comments, please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J. Maurer, P.E. <br /> TJM:tw <br /> • <br /> Howarc R. Green Company <br /> O:\PROJ\812720J\0240\Ltr 01-16-01 McPhersonNSULTING ENGINEERS <br />