Laserfiche WebLink
C <br /> to <br /> Create a plan that can be built in phases accordingprojected <br /> L <br /> • E-2: P Jected <br /> market absorption rates and availability of sewer and water lines. <br /> E-3: Identify sites that may develop as commercial in the near future. <br /> E-4: Identify future uses which may be advantageously located near the <br /> Sherburne County Government Center. <br /> GOAL F <br /> MAXIMIZE THE RETURN ON CAPITAL INVESTMENT IN PUBLIC E, <br /> INFRASTRUCTURE. <br /> Objectives <br /> F-1: Provide infrastructure which is needed to accommodate and pro— <br /> mote development including roadway, storm water management, <br /> water and sewer installation. [ <br /> F-2: Create value while investing in infrastructure by doing it in a way <br /> • that creates additional amenity or improves site character. For r <br /> example, install landscaping and urban design elements with <br /> roadway improvements, or create storm water holding ponds and [ <br /> drainage ways which also serve as open space amenity. <br /> rl <br /> F-3: Plan for usable public open space in the redevelopment of the L <br /> Sherburne County Fairgrounds that relates to the Lake Orono <br /> Park site. [_ <br /> rJ, <br /> • <br /> 1 J. <br /> 36 <br /> ri <br /> 1� <br />