My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. PCS 01-25-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
01/25/2005
>
5.8. PCS 01-25-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 10:58:14 AM
Creation date
4/18/2005 2:47:08 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/25/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />TRAFFIC ANALYSES <br /> <br />To determine the impacts ofthe proposed development on the subject intersections, <br />capacity analyses were completed for all traffic scenarios described earlier during both <br />the a.m. and the p.m. peak hours. Our capacity analyses were completed using Synchro <br />and the Highway Capacity Software. . <br /> <br />For our capacity analyses, we used existing geometrics and traffic controtat the TH <br />169/Main Street intersection for all three traffic scenarios, existing, 2006no~build, and <br />2006 build. Although this intersection presently is operating as uncoordinated" Mn/DOT <br />would have operated this intersection as coordinated if a suitable signal phasing and <br />timing plan was developed. Mn/DOT is in the process of identifying a satisfactory plan <br />for this signalto achieve the coordination patterns that were provided to us and <br />implement the plan this summer. Therefore, we used the coordinated signal parameters <br />provided by Mn/DOT staff in our capacity analyses for all traffic scenarios to provide a <br />reasonable comparison of existing and future c6nditions. At the Main Street/Carson <br />Street intersection, we used existing geometrics and traffic control for existing. and 2006 <br />....... ... <br />no-build conditions. For the 2006 build conditions, we used stop.control on the north and <br />the south approaches, one left turn lane, one through lane, and one right turn lane on the <br />west approach, one left turn lane, one through lane, and one shared through/rightturn <br />lane on the east approach, one shared through/left turn lane and one right turn lane on the <br />north and the south approaches. <br /> <br />. <br /> <br />Capacity analysis results are presented in terms of Level of Service (LOS), which ranges <br />from A to F. r"OS A represents the best intersection operation, with very little delay for <br />each vehicle using the intersection. LOSF represents the worst intersection operation <br />with e~cessive delay. Most agencies in Minnesota consider that LOS D represents the <br />minimal acceptable LOS for normal peak traffic conditions. Results of our capacity <br />analyses are presented in Figure 4. <br /> <br />TH 169/Main Street Intersection. As shown in Figure 3, all movements at the TH <br />169lMain Street intersection during the. a.m. peak hour are presently operating at LOS D <br />or l:2etter and will operate at D or better for the future scenarios, except for the westbound <br />left turns. The westbound left turns presently are operating at LOS E and will continue to <br />operate at E even after the completion of the proposed development. As indicated in <br />Figure 3, the proposed development will not cause any change in LOS at this intersection <br />during the a.m. peak hour. <br /> <br />Although four movements atthe TH 169/Main Street intersection operate at LOSE or F <br />during the p.m. peak hour, the change in LOS from the 2006 no-build condition to the <br />2006 build condition is minimaL Therefore, it is our opinion that the proposed <br />development will have minimal impacts on the TH 169/Main Street intersection during <br />both the a.m. and the p.m. peak hours. <br /> <br />. <br /> <br />Main Street/Carson Street. As indicated in Figure 3, all movements at the Main Street/Carson <br />Street intersection are presently operating at LOS D or better and will opewte at LOSD or <br />better for 2006 no-build condition during both the a.m. and the p.m. peak hours, except for the <br />southbound left turns, which will operate at LOS E for the 2006 no-build condition during the <br />
The URL can be used to link to this page
Your browser does not support the video tag.