Laserfiche WebLink
Ms. Michele McPherson <br /> February 19, 2000 <br /> Page 3 <br /> • Association. In order to accommodate this design, the public road, Yale <br /> Street, needs to be offset within the existing right-of-way. We believe this is a <br /> reasonable approach to eliminating 22 driveways onto Yale Street which will <br /> have commercial operations on the north side of it. <br /> • The extension of 171st Avenue will require the filling of an existing wetland. <br /> This is unavoidable due to the location of the signalized intersection. The <br /> project will still have to go through a Technical Evaluation Panel. <br /> • There is a significant amount of grading needing to be accomplished in the <br /> TH 10 right-of-way. This includes removing driveway approaches and <br /> creating new street access points at 171st Avenue and 173rd Avenue. A <br /> MnDOT permit will be necessary for all of this work. <br /> • A larger scale grading plan should be submitted for the final approved <br /> grading plan. This larger scale plan should show in greater detail how the <br /> driveways to the townhomes will be constructed so that they will drain <br /> properly. At the scale of this plan, it is difficult to determine whether or not all <br /> of these will adequately drain. <br /> • We question whether sufficient guest parking is provided for the townhome <br /> units. <br /> • Consideration should be given to relocating the north end private driveway <br /> access onto Yale Street. Perhaps it could be moved back to coincide with a <br /> driveway access into Lot 6, Block 1. <br /> • The street section shown should have B618 concrete curb and gutter instead <br /> of B612. The strength of the street section shown is adequate. The width of <br /> the street section is 39 feet face to face, slightly larger than the typical <br /> • residential street of 32 feet face to face. This should be adequate to <br /> accommodate the commercial traffic along with the residential traffic from the <br /> townhomes. <br /> • It is unclear what the section of the townhome private drive is planned at, and <br /> whether or not it will include concrete curb and gutter. It should have <br /> concrete curb and gutter provided and be a minimum of 20 feet wide, <br /> allowing for emergency vehicle access. <br /> • The other item that is difficult to determine is the width of the median between <br /> the public road and the private driveway. It appears to measure <br /> approximately 8 feet in width. Separation between these two roadways <br /> needs to be adequate to allow for snow storage. <br /> D. PRELIMINARY UTILITY PLAN <br /> • Sanitary sewer and water are stubbed under TH 10 near the south end of this <br /> plat. These utilities will be continued through the plat and eventually <br /> extended northerly to serve the existing businesses. If the road connection is <br /> made to the north then water can be looped up to near the Americlnn where, <br /> again, water is stubbed under the highway. If this connection is not made, <br /> then water should be jacked under TH 10 to connect to the existing water on <br /> the north side of the highway to provide a loop system so that adequate fire <br /> fighting pressure and flow would be available. <br /> • At the south end of the plat, Lots 1 and 2, Block 2, a decision will have to be <br /> made at the time of the development of these lots whether or not looping of <br /> • watermain through and around the proposed buildings is necessary to <br /> position hydrants for fire fighting capabilities. Currently, no hydrants are <br /> C:\TEMP\Ltr 02-19-01 McPherson.doc <br /> Howarc R. Green CoTpany <br /> CONSULTING ENGINEERS <br />