Laserfiche WebLink
Mr. Scott Harlicker <br /> February 21, 2001 <br /> Page 2 <br /> • 2. PRELIMINARY PLAT <br /> • Currently, the only access points for this plat are Waco Street in the <br /> southeast corner and 183rd Avenue in Big Lake Township in the southwest <br /> corner. <br /> • There could be access in the northeast corner of the plat which leads out to <br /> the realigned Waco Street. It is unclear whether it is reasonable for this plat <br /> to connect to that point. There are wetlands lying between the access point <br /> to Waco Street and the last street within the plat. <br /> • The street that extends to the northerly plat line along Buildings 1 and 2, <br /> Block 9, needs to be to City standards. This will be the route that will provide <br /> one access point to the 10 acres to the north. <br /> 3. GRADING, DRAINAGE, AND WETLAND MITIGATION <br /> • There are two points on Waco Circle where wetlands will be impacted by <br /> constructing the road. There is also a portion in the northern part of the plat <br /> where street construction will impact wetlands. There is wetland mitigation <br /> shown on the plan; however, no Technical Evaluation Panel has been held at <br /> this point to review the wetland issues. The plat will have to go through a <br /> TEP review and meet all the conditions set forth. <br /> • All of the wetland areas, wetland mitigation areas, and ponding areas will <br /> need to be within drainage and utility easements. It is unclear whether all of <br /> the common space in this development will be designated as drainage and <br /> • utility easement. If not, specific easements will need to be provided around <br /> the wetland and ponding areas. <br /> • If another City street were extended to the property to the north from the <br /> northwest portion of the plat, the property to the north could potentially <br /> develop without filling wetlands for road purposes. <br /> • Not enough detail is shown at the southerly, westerly, and northerly <br /> boundaries to determine whether the grading matches adjacent properties. <br /> • There are several locations in the development where drainage crosses lot <br /> lines, emergency overflow elevations are missing, and other specific drainage <br /> issues need to be detailed. We believe all of these can be reasonably <br /> accomplished. We will be meeting with the Developer's engineer to go <br /> through these issues in detail prior to the submittal of the final grading plan. <br /> • There is an approximately 5-acre piece with a single-family homestead on it <br /> in the northeast corner. We question whether public street access should be <br /> provided to the property line of this parcel, should it be subdivided in the <br /> future. <br /> • There is no park area shown on the plat. Given the 178 units proposed, it <br /> would seem reasonable that some small park area for playground equipment <br /> be provided. <br /> 4. UTILITY PLAN <br /> • Sanitary sewer will be provided from a stub in the southeast corner of the <br /> plat. All of the sanitary sewer extended through the development will be <br /> considered public utilities and will need to fall within public rights-of-way or <br /> easements. Sanitary sewer needs to be extended to the north limits of the <br /> 0:\PROJ\812970J\0240\Ltr 02-19-01 McPherson.rev.doc <br /> Howarc R. Green CoTcany <br /> CONSULTING ENGINEERS <br />