Laserfiche WebLink
• Ms. Michele McPherson <br /> February 5, 2001 <br /> Page Two <br /> 5. The utility plan shows an extension of the existing storm sewer into the parking <br /> area between the proposed building and the Country Inn and Suites building. <br /> There is no emergency overflow for the last catch basin on this line. Grading of the <br /> parking area should provide for an emergency overflow, such that if this catch <br /> basin is plugged or overwhelmed by a large storm, the runoff will leave the site and <br /> not endanger the building. <br /> 6. The parking area between the existing Perkins Restaurant and the new building is <br /> proposed to drain southwesterly through the Perkins site. Is this acceptable to the <br /> owner of the Perkins Restaurant? <br /> If you have any questions regarding these comments, please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J."Maurer, P.E. <br /> • TJM:tw <br /> • <br /> 0:\PROJ\813560J\Ltr 02-05-01 McPherson.doc <br /> Howarc R. Green Company <br /> CONSULTING ENGINEERS <br />