My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 .& 5.6. 01-25-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
01/25/2005
>
5.5 .& 5.6. 01-25-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 10:57:53 AM
Creation date
4/18/2005 2:42:47 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/25/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />only way this location can be developed to the density anticipated in the Comprehensive <br />Plan Update is if urban services are available. <br />. Does the project move Elk River towards its vision for the future? We believe that it <br />does. With the current development in the areas around this site and the North Star <br />Corridor Train station planned for the area just east of this site, an R-3 type development <br />will fit well with the vision of growth for tllls area. In addition, it provides a nice <br />transition from the single family housing to the north and lllgh density development to <br />the south. <br />. Is the project consistent Witll the policies contained in the Plan? It is our intent to <br />develop the project in a manor that is consistent with the Comprehensive Plan Update. <br />Furthermore, should you grant our request there will be further opportunity to review <br />tlle development at the preliminary plat and final plat stage to ensure that we are <br />remaining consistent with your plan. <br /> <br />. <br /> <br />Concept Plan <br /> <br />A concept plan is included with this request. Our conceptual design for the site includes <br />townhomesin two to five unit "sticks". We anticipate approximately 32 units total to be located' <br />on the property. In conjunction with tllls concept, we intend to work with the City and its <br />planners to ensure that this development maintains Elk River's unique identity and character. <br />Natural, cultural and lllstorical resources of the community are essential ingredients of Elk <br />River's identity and we intend to protect and enhance the wetlands and their buffers on the site <br />in ways that exceed the wetland conservation act rules, regulations, and requirements. In fact, <br />we hope to create a development that focuses on the natural elements of this site and makes <br />them an attractive feature that will be valued by the people who choose to make tllls area their <br />home. <br /> <br />We are advocates of landscape ecology and sustainable site development and intend to create a <br />site that focuses on low impact development practices and implements stormwater best <br />management practices to ensure the development works in harmony with the surrounding <br />landscape. A wetland delineation has been done and the wetland boundaries are shown 011 the <br />concept plan. We intend to submit an application to Rebecca Haug, City of Elk. River <br />Envirorunental pla1?1ler, wlllch includes the de1jne~tion report and inform~tio~ regarding the <br />small impact (less than 400 square feet) to the low quality wetland near the center of the site. <br />Recent discussions with Ms. Haug lead us to believe the information she is interested in needs to <br />be in her hands by the end of the day on January 6, 2005. (please let us know if you need tllls <br />information as well, or if it needs to be submitted sooner.) <br /> <br />Hardships <br /> <br />The following paragraphs address the hardslllps that we would bear if these request are not <br />granted. <br /> <br />.. <br /> <br />We are requesting this change because denial of urban services will prevent us from <br />developing the land to the potential envisioned in the Comprehensive Plan. The existing <br />home/parcel is now vacant and if l1rban services are not available to the proposed <br />development only two homes can be constructed. on the lot. With urban semces and <br />the requested zoning, the site can be developed to include approx:iriiately 32 townhomes. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.