My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2001
>
04-24-2001
>
5.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 10:55:58 AM
Creation date
5/7/2018 10:55:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
south of the subject site. If the request to remove them from the Urban Service <br /> • District is granted, the design of the sewer and water to serve the site to the south <br /> would generally not include a review of what it would take to provide service to this <br /> site. Therefore, the sanitary sewer may not be provided with extra depth if that is <br /> needed to ultimately serve this site, nor would there be provisions to extend <br /> watermain for looping purposes or possibly even easements to extend sanitary sewer <br /> to the site. In the future, if the owners would petition to be included in the Urban <br /> Service District, the extraordinary costs may include a lift station for sanitary sewer <br /> service, easement acquisition for extending the sewer and looping of the watermain <br /> and the developers would be required to pay these extraordinary costs and acquire <br /> any necessary easements. <br /> If you have any questions regarding these comments, please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> , 6(7--/14-er(-e4) <br /> Terry J. Maurer, P.E. <br /> • <br /> • s:\planning\letters\230000m.doc <br /> Howarc R. Green Company <br /> CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.