My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2001
>
04-24-2001
>
Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 10:45:05 AM
Creation date
5/7/2018 10:45:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Minutes <br /> April 24,2001 <br /> Page 2 <br /> • starting in June. The areas shown in gray on the plans will be let out for bids soon, <br /> for construction this summer. He stated that the exterior of the building will consist <br /> of pre-cast concrete and brick which will blend with the existing materials, and <br /> that new entrance will be created which will be easily identifiable. Visitor parking <br /> will be restricted to this new westerly access for security purposes. <br /> Mr. Harlicker reviewed the layout of the proposed expansion and the <br /> landscaping plan. Staff recommends approval of the request with the four <br /> conditions listed in the staff report dated April 24, 2001. <br /> Chair Pederson opened the public hearing. There being no further comments <br /> from the public, Chair Pederson closed the public hearing. <br /> Commissioner Mesich asked if the auditorium would be suitable for other activities <br /> in the community. Mr. Haluptzok stated that typically these types of facilities are <br /> used more by the community than the schools and that would likely be the case <br /> in Elk River. He noted that the auditorium will seat 800 people. <br /> COMMISSIONER MESICH MOVED TO RECOMMEND APPROVAL OF THE REQUEST BY <br /> INDEPENDENT SCHOOL DISTRICT#728 FOR A CONDITIONAL USE PERMIT, CASE NO. <br /> CU 01-14,TO CONSTRUCT A 53,500 SQUARE FOOT EXPANSION TO THE SENIOR HIGH <br /> SCHOOL, WITH THE FOLLOWING CONDITIONS: <br /> 1. ALL COMMENTS OF THE CITY ENGINEER SHALL BE ADDRESSED. <br /> 2. ALL NEW SIGNS REQUIRE A SIGN PERMIT. <br /> 111 3. THE LANDSCAPING PLAN SHALL BE REVISED SO THAT IT COMPLIES WITH THE <br /> LANDSCAPE ORDINANCE. <br /> 4. A 20 FOOT WIDE LANE SHALL BE MAINTAINED THROUGH THE STAGING AREA <br /> COMMISSIONER SCHUSTER SECONDED THE MOTION. THE MOTION CARRIED 4-0. <br /> 5.2. Request by Independent School District #728 for a Conditional Use Permit to <br /> Construct Expansion to Parker Elementary School, Public Hearing-Case No. CU <br /> 01-15 <br /> Staff report by Scott Harlicker. KKE Architects, on behalf of ISD #728, is requesting <br /> a conditional use permit to construct a 6,810 square foot expansion to Parker <br /> Elementary School which is located on School Street between Freeport and <br /> Jackson Avenue. Mr. Harlicker reviewed the layout of the proposed expansion. <br /> He noted that some of the existing landscaping will need to be removed and <br /> replaced in appropriate locations. Mr. Harlicker stated that the City Engineer has <br /> stated he has no major issues with the site regarding grading and drainage. No <br /> new signage is proposed. Staff recommends approval of the request with the <br /> two conditions in the staff report. <br /> Mr. Dick Haluptzok, KKE Architects, stated that the proposed expansion includes <br /> increased space for kindergarten, special education, an new band and music <br /> room, and a multi-purpose room. Mr. Nansen noted that Parker is currently the <br /> smallest of the schools and the expansion will provide more effective use of the <br /> site and building. <br /> III <br />
The URL can be used to link to this page
Your browser does not support the video tag.