My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 01-25-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
01/25/2005
>
5.3. PCSR 01-25-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 10:56:54 AM
Creation date
4/18/2005 2:36:55 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/25/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Masxun Fumiture/CU 04-39 <br />Janmuy 18, 2005 <br /> <br />. <br /> <br />C. Preliminary Utility Plan <br /> <br />. The site will receive sanitary sewer and water service from Industrial Circle to the <br />south. There is an existing 6" water and sewer stub, which will be extended to the <br />building. Currently, the site shows no internal hydrants. A separate review memo <br />from Fire Chief Bruce West indicates an internal hydrant is required near the <br />northeast corner of the building. <br /> <br />. There is proposed storm sewer construction to take place on the site. exiting into the <br />newly arranged storm water pond. All of the end sections should include trash <br />guards. <br /> <br />. Development of the site will require construction of a new driveway off 179th <br />Avenue and two new driveway access points off of Industrial Circle. In addition, <br />there aretwo existing driveway accesses constructed off of Industrial Circle, which <br />will need to be closed. The closing of these will require the removal of the radii and <br />the continuation of B618 concrete curb and gutter through the driveway opening. <br />The newly constructed driveways will require valley gutters if the existing grades are <br />not appropriate to continue drainage flow through the driveway openings. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />. <br /> <br />Sincerely, <br /> <br />T~~ <br /> <br />City Engineer <br /> <br />. <br /> <br />S:\PLA.l'fN1NG\Case Files\2004\CU 04-39 Maxsun FUllliture\1.1S.05 Engineer's memo.doc <br /> <br />Page.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.