Laserfiche WebLink
I <br /> I <br /> ell b. Slopes: <br /> Slopes will be reclaimed in accordance with the reclamation <br /> I <br /> plan. Finished slopes will not exceed 4:1 . <br /> Ic. Cover and Planting: <br /> A minimum of 3" of topsoil will be placed over reclaimed slopes. <br /> IThe slopes will be seeded in accordance with the reclamation <br /> plan. The vegetation will be periodically inspected to insure that <br /> it has become self-sustaining. <br /> I <br /> Id. Slopes to Water Bodies: <br /> There are no water bodies existing on site. Mining below the <br /> I water table to create a water body is not contemplated under <br /> this permit, although a permit revision may be requested at <br /> some time in the future. If this occurs, slopes to water bodies <br /> 10 will be in compliance with the City Ordinance. <br /> I <br /> e. Water Bodies: <br /> All water bodies resulting from extraction - for example <br /> Itemporary storm water ponding areas, will either be filled at the <br /> end of each construction season or preserved to continue to <br /> operate as a holding pond at the discretion of the City. <br /> I <br /> I <br /> I <br /> I <br /> IP <br /> I16 <br />