Laserfiche WebLink
1 <br /> • 6.) Transportation Routes: <br /> The site access is off of 2215` Ave., which was realigned and hard- <br /> surfaced in 1998-1999. This work was proposed in the original <br /> mining permit application. Asphalt now extends from US 169 to the <br /> west past the site entrances and western boundary. Plans included in <br /> ' this application illustrate the new alignment and grades of 221st <br /> Avenue. Access to the southern portion of the site was realigned in <br /> the spring of 2001 . The new alignment is directly across from the <br /> ' plant entrance, improving site lines and safety. Average traffic <br /> generated from the site is expected to range from 100-150 trucks per <br /> day (200-300 truck trips) and is not expected to change as a result of <br /> 1 the proposed amendment. <br /> Acceleration lanes were added to the north and south on US 169. <br /> ' Turn lanes are also currently in place from US 169 to 221' Ave. <br /> 7.) a. Physical relationship of site with respect to the community. <br /> The site is located near the northern boundary of Elk River. The <br /> site is immediately west of U.S. Highway 169. The site is <br /> approximately 3 miles north of the developed area of Elk River. <br /> ' b. Site analysis: <br /> ' The southern portion of the site is located south of 221st Ave. <br /> Past mining activity occurred on this site by previous owners <br /> prior to the initial Tiller CUP. Tiller has actively mined this area <br /> ' over the past 4 years. The material is excavated and then <br /> hauled south approximately 1 .5 miles to a washplant for further <br /> ' processing. The terrain is irregular with little topsoil or <br /> overburden. The western area of this portion of the site is <br /> wooded. <br /> ' Portions of the northern parcel of land were also mined prior to <br /> Tiller's CUP. The area of past mining activity has brush for <br /> ' ground cover and little overburden. This area is where the <br /> asphalt plant was constructed. Berms have been constructed <br /> along US 169 and a portion of 221st Ave. for screening. The <br /> ' remaining portion of the property is wooded, with varying <br /> amounts of topsoil. <br /> t7 <br />