Laserfiche WebLink
The East 1/2 of the Southwest '/4 of Section 3, Township 33, Range 26 <br /> lying West of US 169, Except the northerly 525' <br /> And <br /> The W 1 of the SW 1/4 of Section 3, Township 33, Range 26, Except <br /> ' the north 525 feet thereof <br /> And <br /> That part of the North 1121 .92 feet of the Northwest Quarter of <br /> Section 10, Township 33, Range 26, Sherburne County, Minnesota <br /> lying east of a line which begins at a point on the north line of said <br /> Northwest quarter distant 965.801 feet east, as measured along the <br /> ' north line from the northwest corner thereof; thence south at a right <br /> angle 1 121 .92 feet; and lying west of the westerly right-of-way line of <br /> U.S. Highway No. 169 as laid out and traveled in 1963. <br /> ' 2.) Name and Address of Operator and Land Owner: <br /> Tiller Corporation <br /> 7200 Hemlock Lane <br /> Suite 200 <br /> P.O. Box 1480 <br /> Maple Grove, MN 5531 1-6480 <br /> (763) 425-4191 <br /> 3.) Names and addresses of all adjacent land owners within 350 feet of site <br /> See attached Exhibit 1 . <br /> ' 4.) Purpose of Extraction: <br /> The purpose of the extraction is to remove an existing deposit of sand <br /> and gravel and process it into construction aggregate, processing of <br /> ' recyclable concrete and asphalt and hot mix asphalt production. The <br /> site serves the growing needs of Elk River and the surrounding area. <br /> ' 5.) Estimated Time Required to Complete the Proposed Extraction: <br /> The site is operated in phases. It is estimated that the proposed <br /> ' revisions to the mining limits will add an additional 2-3 years to the <br /> over all mining operation. The original mining operation was estimated <br /> to take 20-25 years to complete mining. The duration of mining <br /> activities is approximate only and is dependent upon market demand. <br /> 111. <br /> 6 <br />