Laserfiche WebLink
• <br /> Proposed Temporary Classroom Impact Plans <br /> Grading/Drainage Plan: <br /> The classrooms would set on current asphalt parking lot and would not render any <br /> changes. <br /> Drainage Calculations: <br /> Calculation for the property would also remain unchanged. <br /> Wetland Delineation and Mitigation: <br /> Impact of wetlands in neighboring park would also remain unchanged. <br /> Utility Plan: <br /> Current electrical utility enters existing building within 30 ft. of proposed location <br /> of classroom. Utility crews would be able to make hook up to proposed <br /> classrooms easy and safe. The classrooms contain no sewage or water hook ups. <br /> Landscape Plan: <br /> Existing landscaping would remain the same. <br /> • Building Elevations: <br /> Proposed classroom would be elevated to 18" from asphalt on east to 30" from <br /> asphalt on west. <br /> Wall and Freestanding Sign Plans: <br /> Existing church/school signs on School St. would remain unchanged. <br /> • <br />