Laserfiche WebLink
• FLOODPLAIN <br /> The development as proposed does not impede floodwaters in the floodplain. The <br /> removal of sediment from storm water run-off is required by the city, prior to discharge <br /> into the river. Retention of the net increase in run-off from development is also required. <br /> Sedimentation is not allowed in the floodplain, but retention is. The development appears <br /> to be allowing for the necessary sedimentation and retention outside of the floodplain. <br /> Recommended Floodplain conditions: <br /> > That the City Engineer determines the adequacy of storm water <br /> sedimentation and retention for the development and that no sedimentation <br /> is allowed in the floodplain. <br /> MINNESOTA DEPARTMENT OF NATURAL RESOURCES <br /> City staff discussed the material contained in this memo with Patty Fowler, Area <br /> Hydrologist for the DNR, on February 22, 2001. She was in agreement with staff's <br /> recommendations. <br /> • <br /> • <br />