My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2001
>
06-26-2001
>
5.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 9:22:57 AM
Creation date
5/7/2018 9:22:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ai PP' <br /> .. <br /> pm. <br /> Sherburne County lerkkot> <br /> PUBLIC WORKS —1�Iii� <br /> �■���amm� <br /> 111111111m=111111111111 <br /> DEPARTMENT Rhonda F. Lewis, P.E. <br /> April 19, 2001 425 Jackson Avenue <br /> Elk River, MN 55330 <br /> (763) 241-7030 • 800-594-5208 <br /> Paul Cherne, P.E. <br /> Pioneer Engineering <br /> 625 Hwy 10 N.E. <br /> Blaine, MN 55434 <br /> RE: Gold Nugget Development <br /> Dear Mr. Cherne: <br /> After reviewing the proposed preliminary plat, an access permit will be required with the following conditions: <br /> 1) A right turn lane built to MnDOT standards. <br /> 2) A bypass lane built to County standards. <br /> 3) Make all pavement-marking changes as necessary. <br /> • 4) Pay the required signage fees of$450.00 for four signs, with installation done by the Public Works <br /> Department. The Developer must notify Dick Corbin, Permitting Agent (241-7034) for sign <br /> installation when the road is open to the traveling public. <br /> 5) Any existing field entrances must be removed. <br /> 6) The Developer is responsible for drainage studies. If your engineers determine a culvert is <br /> necessary, the culvert must have 6:1 safety aprons and grates. Both the costs of the culvert and the <br /> installation are the responsibility of the developer. <br /> Remember that slopes within County right-of-way for your proposed street must be 6:1 and all disturbed areas <br /> must have topsoil and seed applied. All requirements are listed on the back of the permit. The Access to <br /> County Highway Permit Application must be applied for at the Public Works office on Jackson Ave. <br /> Please carefully read the backside of the permit. All requirements must be met for final inspection <br /> approval. After construction is completed, date and sign the bottom portion of the application and return <br /> it to the Public Works office on Jackson Ave. Upon final inspection and approval by the County, Access <br /> Bond Fee will be returned to you.NOTE: Please check your return address for proper bond fee return! <br /> If you have any questions or concerns please call me at (612) 241-7030. <br /> Sincerely, <br /> l'honda F. Lewis, P.E. <br /> Assistant County Engineer <br /> cc: Kathy Heaney, Co. Atty. <br /> Nancy Riddle, P&Z <br /> John Oliver, Co. Surveyor <br />
The URL can be used to link to this page
Your browser does not support the video tag.