Laserfiche WebLink
= Architectural Group Ltd. <br />15 Groveland Terrace • Minneapolis. MN 55403-1 154 <br />Telephone 612.377.2737 • Facsimile 61 2:377.1 331 <br />E -Mail arehODkodet.com • Website www.kodet.com <br />March 26, 2018 <br />Mr. Zack Carlton <br />City of Elk River - Planning Manager <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />Re: Elk River Jackson Street Historic Water Tower - Renovation <br />Dear Mr. Carlton: <br />We have evaluated the existing water tower and generated budgeting numbers to help <br />assist you in the grant submission. The existing water tower was scanned by a UAV (Unmanned Aerial Vehicle) on <br />February 81h, 2018. We have taken the data from the scan and converted it into a scaled drawing which was used for cost <br />estimating by two painting contractors. Both painting contractors have separated out their cost estimate into three options as <br />noted below. Each of the three options give you different levels of restoration to choose from: <br />I . Option 1 (short term) - pressure wash water tower and repaint. Fix structural items as noted in report dated August <br />3, 2015. <br />2. Option 2 (medium term) - pressure wash and sand blast only problem areas as identified in report and repaint. Fix <br />structural items as noted in report dated August 3, 2015. <br />3. Option 3 (Long term) - remove all the lead base paint by sand blasting the entire water tower and repaint. Fix <br />structural items as noted in report dated August 3, 2015. <br />The two attached cost estimates from the painting contractors did not include the <br />following mark-ups - 25% Soft Costs, 20% for contingency and 10% per year for inflation - see cost breakouts below. <br />Estimate / <br />Soft <br />Costs (25%Z <br />/ Contingency <br />(20%) / 2018 cost <br />/ 2019 cost (10%) <br />/ 2020 cost (10%) <br />1. Slack Painting: <br />a. Option I - $92,000 <br />+ <br />$23,000 <br />+ $18,400 <br />= $133,400 <br />$146,740 <br />$161,414 <br />b. Option 2 - $130,000 <br />+ <br />$32,500 <br />+ $26,000 <br />= $188,500 <br />$207,350 <br />$228,085 <br />c. Option 3 - $390,000 <br />+ <br />$97,500 <br />+ $78,000 <br />= $565,500 <br />$622,050 <br />$684,255 <br />2. TMI Coating: <br />a. Option 1 - $153,000 <br />+ <br />$38,250 <br />+ $30,.600 <br />=$221,850 <br />$244,035 <br />$268,439 <br />b. Option 2 - $193,000 <br />+ <br />$48,250 <br />+ $38,600 <br />= $279,850 <br />$307,835 <br />$338,619 <br />c. Option 3 - $385,000 <br />+ <br />$96,250 <br />+ $77,000 <br />= $558,250 <br />$614,075 <br />$675,483 <br />Mr. Carlton, we again appreciate the opportunity to work with you and everyone with <br />the City of Elk River on this project. Let us know if you need additional information for the grant submission. If you have <br />any questions, please contact me. <br />Sincerely, <br />K ET AR HITECTURAL GROUP, LTD. <br />dward J. K et, Jr., FAIA, ED AP BD+C <br />Attachments: <br />Existing Drawing <br />TMI and Slack painting proposals <br />Architecture - Interior5 • Planning <br />