Laserfiche WebLink
PAY ESTIMATE #8 <br />CITY OF ELK RIVER <br />2017 Street Improvements <br />Rin SCHFnIII F"r" _ C A P. 9nd.154.nn1 . FVANS CTRFFT <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />MOBILIZATION <br />0.06 <br />LUMP SUM <br />580,250.83 S <br />4,815.05 <br />0.06 <br />$ 4,815.05 <br />2 <br />REMOVE CURB AND GUTTER <br />2160 <br />LIN FT <br />S5.20 $ <br />11,232.00 <br />1.859 <br />$ 9666.80 <br />3 <br />REMOVE CONCRETE PAVEMENT <br />1,412 <br />SO FT <br />$1.46 S <br />2.061.52 <br />2,778.2 <br />S 4,056.17 <br />4 <br />1 REMOVE CONCRETE WALK <br />2,230 <br />SO FT <br />$1,091 $ <br />2,430.70 <br />4,612 <br />S 5.027.08 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />774 <br />SQ YD <br />$4.84 S <br />3,746.16 <br />1,619 <br />S 7,835.96 <br />6 <br />SAWING CONCRETE PAVEMENT FULL DEPTH <br />230 <br />LIN FT <br />S3.16 S <br />726.80 <br />282 <br />S 691.12 <br />7 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />360 <br />LIN FT <br />S2.09 S <br />752.40 <br />2,550 <br />S 5,329.50 <br />8 <br />SALVAGE SIGN SUPPORT <br />6 <br />EACH <br />$37.45 $ <br />224.70 <br />3 <br />$ 112.35 <br />9 <br />SALVAGE CASTING <br />11 <br />EACH <br />5107.00 S <br />1,177.00 <br />13 <br />S 1.391.00 <br />10 <br />MILL BITUMINOUS SURFACE 1.5" <br />1,544 <br />SO YD <br />S1.95 $ <br />3,010.80 <br />1,949 <br />S 3,800.55 <br />11 <br />MILL BITUMINOUS SURFACE <br />8,330 <br />SO YD <br />SO.59 S <br />4.914.70 <br />8,063 <br />$ 4,75T 17 <br />12 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />883 <br />GALLON <br />$2.51 S <br />2,216.33 <br />870 <br />$ 2,183.70 <br />13 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) <br />1530 <br />TON <br />$47.87 S <br />73,241 A0 <br />1,540.76 <br />S 73,756.18 <br />14 <br />TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING <br />185 <br />TON <br />$59.82 S <br />11 066.70 <br />264.54 <br />$ 15,824.78 <br />15 <br />IADJUST VALVE BOX <br />5 <br />EACH <br />$441.92 S <br />2,209.60 <br />6 <br />S 2.651.52 <br />16 <br />INSTALL CASTING <br />11 <br />EACH <br />$110.48 $ <br />1,215.28 <br />13 <br />S 1,436.24 <br />17 <br />ADJUST FRAME AND RING CASTING <br />2 <br />EACH <br />5994.32 5 <br />1,988.64 <br />1 <br />S 994.32 <br />18 <br />SEAL CATCH BASIN <br />11 <br />EACH <br />$155.15 S <br />1706.65 <br />13 <br />$ 2016.95 <br />19 <br />4" CONCRETE WALK <br />1.400 <br />SQ FT <br />56.37 S <br />8,918.00 <br />991 <br />S 6.312.67 <br />20 <br />6" CONCRETE WALK <br />870 <br />SQ FT <br />$7.44 S <br />6,472.80 <br />3621.38 <br />S 26,943.07 <br />21 <br />CONCRETE CURB AND GUTTER DESIGN 8618 <br />2,160 <br />LIN FT <br />$12.79 $ <br />27 626.40 <br />1,966 <br />S 25 145.14 <br />22 <br />7" CONCRETE DRIVEWAY PAVEMENT <br />157 <br />SQ YD <br />577.04 S <br />12 095.28 <br />309.8 <br />S 23 866.99 <br />23 <br />TRUNCATED DOMES <br />294 <br />SQ FT <br />$48.15 $ <br />14156.10 <br />100 <br />$ 4,815.00 <br />24 <br />TRAFFIC CONTROL <br />0.06 <br />LUMP SUM <br />$79,859.171 S <br />4,791.55 <br />0.06 <br />$ 4,791.55 <br />25 <br />INSTALL SIGN SUPPORT <br />6 <br />EACH <br />$80.25 $ <br />481.50 <br />3 <br />S 240.75 <br />26 <br />STORM DRAIN INLET PROTECTION <br />11 <br />EACH <br />590.95 S <br />1,000.45 <br />12 <br />S 1,091.40 <br />27 <br />STABILIZED CONSTRUCTION EXIT <br />0.06 <br />LUMP SUM <br />S5,200.33 S <br />312.02 <br />0.06 <br />1 S 312.02 <br />28 <br />COMMON TOPSOIL BORROW LV <br />30 <br />CU YD <br />$47.06 S <br />1,411.80 <br />60 <br />$ 2,823.60 <br />29 <br />SEEDING <br />OAS <br />ACRE <br />5374.47 $ <br />56.17 <br />0.15 <br />S 56.17 <br />30 <br />SEED MIXTURE 25-131 <br />25 <br />POUND <br />$3.20 $ <br />60.00 <br />25 <br />$ 80.00 <br />31 <br />IHYDRAULIC NATURAL TACKIFIER <br />533 <br />SO YD <br />$0.75 S <br />399.75 <br />533 <br />S 399.75 <br />32 <br />EROSION CONTROL <br />0.06 <br />LUMP SUM <br />S3,210.00 S <br />192.60 <br />0.06 <br />$ 192.60 <br />33 <br />PAVEMENT MESSAGE EPDXY <br />71 <br />SQ FT <br />$5.73 S <br />406.83 <br />71 <br />S 406.83 <br />34 <br />4" SOLID LINE EPDXY <br />240 <br />LIN FT <br />$0.31 S <br />74.40 <br />280 <br />$ 86.80 <br />35 <br />24" SOLID LINE EPDXY <br />70 <br />LIN FT <br />$6.88 S <br />481.60 <br />29 <br />$ 199.52 <br />4" BROKEN LINE EPDXY <br />1,150 <br />LIN FT <br />$0.31 S <br />356.50 <br />1,100 <br />$ 341.00 <br />ft3736 <br />4" DOUBLE SOLID LINE EPDXY <br />2,250 <br />LIN FT <br />$0.62 S <br />1,395.00 <br />1 2044 <br />S 1 267.28 <br />38 <br />CROSSWALK EPDXY <br />324 <br />SQ FT <br />$3.67 $ <br />11189.08 <br />324 <br />S 1 789.08 <br />Total Bid Schedule "E" $ 210,633.96 S 247,107.66 <br />S:\Municipal\Aelkdver\ER303\PAY ESTIMATES\ER303 PE.xlsx PE - 5 <br />