My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4 PCSR 01-12-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
01-12-1995
>
4 PCSR 01-12-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 12:10:11 PM
Creation date
4/30/2018 1:11:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Steering Committee Page 2 <br /> January 12, 1995 <br /> • (Deerfield, Brentwood, and Ridgewood), the Southeast Area does not have a <br /> large number of 234 acre subdivisions. Without this "belt" of 2% acre lots, the <br /> opportunity to extend city water and sewer easterly becomes easier and more <br /> cost efficient than an extension north along Highway 169. <br /> The other primary land uses in this planning area include commercial and <br /> industrial. Once again, the commercial and industrial areas are located <br /> along the Highway 10 corridor providing excellent visibility and access for <br /> retailing customers and service vehicles associated with industrial <br /> developments. Attached is a breakdown of the land uses mentioned above. <br /> With the exception of the North Planning Area, the Southeast Planning Area <br /> is the least developed and presents some of the best opportunities for future <br /> development consideration. The attached inventory helps illustrate the <br /> amount of available land that could be developed with urban services. <br /> SEWER AND WATER EXTENSION <br /> At an earlier Steering Committee meeting, Terry Maurer presented findings <br /> of a preliminary study which examined the feasibility of extending city water <br /> and sewer east along Highway 10. This feasibility study included two areas: <br /> a "primary study area" and an "ultimate study area" (see attached maps). <br /> • The Committee may wish to discuss these options as well as others to <br /> formulate a long range plan for sewer and water within this Southeast area. <br /> As I will discuss next, the zoning and land use decisions may be impacted by <br /> the decision to extend water and sewer. <br /> LAND USE ISSUES <br /> The Southeast Planning Area's land use/zoning issues can be broken down <br /> into three areas. First of all, depending upon where water and sewer will <br /> ultimately be planned to be extended, the residential zoning of Rla may need <br /> to be modified. In order to efficiently extend city services, larger lot sizes <br /> typically need to be maintained. For example, rather than allowing 21/2 acre <br /> subdivisions to be created prior to city services, a more acceptable practice is <br /> to retain a 10-acre minimum. Under this scenario, 10 acre parcels can be <br /> further subdivided either individually or combined with adjacent parcels to <br /> allow the extension of services in an orderly fashion. The appropriate zoning <br /> district for those properties that will eventually be serviced with the city <br /> water and sewer may be the Al (Agricultural) district which requires a <br /> minimum lot size of 10 acres. <br /> Until these decisions regarding sewer and water extension and appropriate <br /> • zoning are made, a moratorium on subdivisions of land into parcels of less <br /> than 10 acres is in effect for the Southeast Area. This moratorium was passed <br /> planning:steering:1-12meno <br />
The URL can be used to link to this page
Your browser does not support the video tag.