My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1998
>
03-24-1998
>
5.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 12:01:23 PM
Creation date
4/30/2018 12:01:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> license fee is not in lieu of gravel tax collected by the County <br /> • and a portion of which the City receives. <br /> (05) Violations of this Conditional Use Permit may result in <br /> suspension or revocation. <br /> (06) The City Building and Zoning Administrator and/or his/her <br /> agents shall be permitted to inspect the operation for compliance <br /> with the conditions of this permit during normal hours of <br /> operation. <br /> (07) The City's approval of this Conditional Use Permit is subject to <br /> the approval of appropriate permits by other governmental <br /> agencies. <br /> (08) No explosives shall be allowed for this operation. <br /> (09) Reclamation <br /> a. Reclamation shall be implemented on an annual basis <br /> pursuant to the reclamation plans submitted by the <br /> Operator. <br /> • b. Each year a plan for that year's reclamation shall be <br /> approved by the Building and Zoning Administrator prior <br /> to issuance of the annual mineral excavation license. <br /> c. The reclamation shall include top soil from the site being <br /> preserved and put back into place after mining. <br /> d. The vegetation established for the reclamation must be <br /> maintained until it is self sufficient. <br /> e. Contours, finished grades, and details of erosion control <br /> methods, shall comply with the plans submitted and the <br /> City ordinance at the time of reclamation. <br /> (10) Traffic <br /> Except for localized jobs, traffic through Elk River <br /> associated with this operation shall be limited to U.S. <br /> Highway 10 and 169. <br /> • <br /> s:\b&z\stever\gravcup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.