Laserfiche WebLink
The city is proposing to direct the flow of the Elk River through Lake Orono away from <br /> • <br /> the construction activities. The specific of how this is accomplished will be reviewed and <br /> approved by the DNR through their Protected Waters Permit. <br /> With the proposed draw down of the lake, it is anticipated that individuals will request <br /> permits for projects that fall below the Ordinary High Water mark. The DNR has <br /> requested the city's assistance in compiling and coordinating these individual projects. <br /> A study of the wetland inventory map and aerial photos, site visits, and discussions with <br /> the property owners, do not reveal any wetlands on the sediment disposal sites. This will <br /> be field verified as soon as conditions permit in the spring. Under no circumstance will <br /> sediment be placed in a wetland. <br /> CERTIFICATION BY THE RGU (all 3 certifications must be signed for EQB <br /> acceptance of the EAW for publication of notice in the EQB Monitor) <br /> a. I hereby certify that the information contained in this document is accurate and complete to the best of <br /> my knowledge. <br /> Signature._ / <br /> def <br /> b. I hereby certify that the project described in this EAW is the complete project and there are no other <br /> projects,project stages,or project components, other than those described in this document,which are <br /> • <br /> related to the project as"connected actions"or"phased actions,"as defined,respectively, at Minn. <br /> Rules,pts.4410.0200,s bp. 9b a sub . 60. <br /> Signature <br /> C. I hereby certify that copies of the completed EAW are being sent to all points on the official EQB <br /> EAW distribution list. <br /> Signature Zit <br /> J , <br /> Title of signer h3v f 20/1-'1/4-)6 /4 PA Date 2/3 98 <br /> G i TY o F ELK !e!vEl2 <br /> • <br />