My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1998
>
03-24-1998
>
5.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 11:59:14 AM
Creation date
4/30/2018 11:59:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• c. Identify any toxic or hazardous materials to be used or present on the project site and identify <br /> measures to be used to prevent them from contaminating ground water. <br /> Core samples, taken as directed by MPCA, indicated no hazardous substances present in <br /> the lake sediment. Typical fuels associated with construction equipment will be used. <br /> The contractor who is hired will be required to submit a spill prevention and counter <br /> control plan for approval. <br /> • <br /> 21. Solid Wastes; Hazardous Wastes; Storage Tanks <br /> a. Describe the types,amounts, and composition of solid or hazardous wastes to be generated, including <br /> animal manures, sludges and ashes. Identify the method and location of disposal. For projects generating <br /> municipal solid waste indicate if there will be a source separation plan; list type(s)and how the project will <br /> be modified to allow recycling. <br /> N/A <br /> b. Indicate the number, location,size,and use of any above or below ground tanks to be used for storage <br /> of petroleum products or other materials(except water). <br /> The project does not involve the storage of any products. <br /> • 22. Traffic <br /> Parking spaces added—N/A— Existing spaces(if project involves expansion)_N/A Estimated total <br /> Average Daily Traffic(ADT)generated_N/A_ Estimated maximum peak hour traffic generated (if <br /> known)and its timing N/A <br /> Provide an estimate of the impact on traffic congestion on the affected roads and describe any traffic <br /> improvements which will be necessary. <br /> N/A <br /> 23. Vehicle-Related Air Emissions Provide an estimate of the effect of the project's traffic <br /> generated on air quality, including carbon monoxide levels. Discuss the effect of traffic improvements or <br /> other mitigation measures on air quality impacts. (if the project involves 500 or more parking spaces, <br /> consult"EAW Guidelines"about whether a detailed air quality analysis is needed.) <br /> N/A <br /> 24. Stationary Source Air Emissions Will the project involve any stationary sources of air <br /> emissions(such as boiler or exhaust stacks)? Yes _x No <br /> If yes, describe the source,quantities, and composition of the emissions;the proposed air pollution control <br /> devices;the quantities and composition of the emissions after treatment; and the effects on air quality. <br /> N/A <br /> 25. Will the project generate dust, odor, or noise during construction and/or operation? x Yes No <br />
The URL can be used to link to this page
Your browser does not support the video tag.