Laserfiche WebLink
<br />The SWCD will be installing monitoring well to determine the effectiveness of putting in <br />a ditch plug. There will be a monitoring well and a piezometer on the east side of the <br />wetland basin 200' south of the ditch and a monitoring well and piezometer on the east <br />side of the basin within 50'00fthe ditch. I depth gauge will also be installed in the ditch <br />to measure water depth. Elevations will need to be established for the wells. Water levels <br />will be recorded at each location on a weekly schedule. This will allow for measuring of <br />the effectiveness of ditch plug. The Park and Recreation Commission believes that the <br />restoration of this wetland is a critical issue <br />