My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.12
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
09-30-1997
>
5.12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 9:45:32 AM
Creation date
4/30/2018 9:45:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• considered for city utilities sometime in the future. However, based on the <br /> present zoning of R1a, the preliminary plat was allowed to proceed forward. <br /> The development was eventually withdrawn, due to some problems the <br /> developers experienced with the property owner. <br /> Overview <br /> The area to be included within the urban service boundary totals <br /> approximately 480 acres. This 480 acres can be broken down as follows: <br /> • 80 acres is Hillside Park which is currently owned by the City <br /> • Approximately 50 acres in consumed by Clever's Marsh <br /> • Approximately 20 acres owned by Minnesota Department of <br /> Transportation <br /> • Approximately another 30 acres is identified wetlands according to the <br /> National Wetland Inventory Maps. <br /> Therefore, based on the ownership of the properties, wetlands, and other <br /> restricting factors, the area probably has approximately 280 - 300 acres for <br /> development potential. By including this area in the urban service boundary <br /> there would be no immediate or foreseeable impact for the property owners in <br /> terms of assessments for utilities. As presented to the Planning Commission <br /> • <br /> in the past, typically, the costs associated with extension of utilities has been <br /> initiated by the development community and absorbed by those properties <br /> directly affected. It is anticipated that if this area is included in the urban <br /> service boundary, it would basically be reserving this area for possible <br /> development to an urban standard. If this area is included in the urban <br /> service boundary, it would be appropriate to consider rezoning the properties <br /> from the current R1a zoning district (2-1/2 acre minimum lot size) to a <br /> residential zoning district consistent with other areas within the urban <br /> service boundary. <br /> The area that has been selected to be considered for inclusion in the urban <br /> service boundary appears to be a logical extension of the existing boundary <br /> that has been adopted by the Council. The proposed area is bounded on the <br /> east by a large lot rural subdivision which is typically difficult to serve with <br /> public utilities because of the cost associated with such an improvement and <br /> also bounded on the south by Cargill. The extension of trunk utilities into <br /> east Elk River may improve the efficiencies of some of the utility <br /> improvements necessary in the east Elk River project. It is not anticipated <br /> that this area would be served until a petition has been submitted by any of <br /> the affected property owners within this area. The subject area south of <br /> County Road 12 may possibly stand on its own and could be developed after <br /> the entire area between County Road 12 and 13 is built out. <br /> \\elkriver\sys\shrdoc\planning\pc\oa97-10.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.