My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
09-30-1997
>
6.3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 9:40:55 AM
Creation date
4/30/2018 9:44:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission/CU 97-23 <br /> September 30, 1997 <br /> Page 2 <br /> • the southeast corner of the property. To date, all of the improvements have <br /> been completed except for the installation of landscaping. During the review <br /> of that conditional use permit, it was noted the church was planning an <br /> addition in the near future and at that time, the balance of the parking lot <br /> would be reviewed for various improvements similar to the east side of the <br /> facility. <br /> Overview <br /> The existing church has a gross floor area of approximately 24,000 square <br /> feet which is comprised of a lower level, upper level and loft level area. The <br /> proposed addition would involve expanding the lower level of the church and <br /> adding on approximately 17,000 square feet. This will bring the church <br /> facility to a total square footage of approximately 41,000 square feet. The <br /> worship area is proposed to have an occupant load of 639 spaces. Therefore, <br /> based on the parking requirements of 1 stall for every three seats, a total of <br /> 241 parking stalls would be required. The number of actual spaces on site is <br /> approximately 344. In addition to the parking stalls on Central Lutheran <br /> Church's site, Lions Park is immediately to the south which has provided <br /> overflow parking opportunities for the church in the past. This shared <br /> parking arrangement has not presented any problems in the past and in fact, <br /> • appears to be an excellent complementary use with one another. <br /> Parking Lot Improvements <br /> Similar to the recommendations to improve the eastern parking lot, it is <br /> being recommended a continuation of the curb and around the parking <br /> facility. The one exception staff would recommend is eliminating the curb <br /> along the western-most portion of the parking lot which is adjacent to a large <br /> number of existing pine trees. The parking lot surface currently is very close <br /> to these trees and any additional construction work along this edge may have <br /> an affect on the health of those trees which serve as a buffer between the <br /> church and apartments immediately to the west. <br /> Building Elevations <br /> The proposed building will include a base brick material throughout a <br /> majority of the building. The roof lines will complement the existing church <br /> facility. <br /> Elk River Municipal Utilities <br /> Elk River Municipal Utilities has recommended relocating the transformer <br /> III <br /> which is located on the north side of the building. A preferred location would <br /> \\elkriver\sys\shrdoc\planning\pc\cu97-23.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.