My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
09-30-1997
>
6.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2018 9:42:19 AM
Creation date
4/30/2018 9:42:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illr; .;04 <br /> = - Howarc R, Green Company <br /> ratu:6�ltir EY1II,1'EBBS <br /> CONSULTING ENGINEERS =olnleriyMSA <br /> September 25, 1997 <br /> :onsulfing Engineer= <br /> File: 801430J-0240 <br /> Mr. Steve Ach <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, Mn 55330-0490 <br /> RE: CULVER'S PROPOSED RESTAURANT FACILITY <br /> Dear Mr. Ach: <br /> As requested, we have reviewed the submittal prepared for the proposed Culver's Restaurant. <br /> The restaurant is proposed to be located in Outlot A of Hillside Crossing Two. As you are <br /> aware, this outlot is being proposed to be replatted as Hillside Crossing Five. Based on our <br /> review, comments received at the staff review meeting, and meeting with the Developer of the <br /> Hillside Crossing area, we would offer the following comments: <br /> • 1. The information submitted was prepared by Landform Engineering Company and c::insisted <br /> of a set of plans containing an Existing Conditions Plan, Preliminary Site Plan, Preliminary <br /> Grading Plan, Preliminary Utility Plan, Floor Plan, and building elevations. They also <br /> submitted a drainage calculation for the site. In our meeting with Mr. Rick Foster, <br /> Developer of the Hillside Crossing area, he indicated that it is not his intent to construct the <br /> entire parking area shown on the Landforrn Engineering Company plans. He indicted that <br /> he intends to construct the access off of Evans Street and everything lying north of that <br /> line. The remaining part of the parking lot would be constructed in the future when <br /> additional development occurs in this area. <br /> 2. The Drainage Plan submitted will work fine with the revised construction which Mr, Foster <br /> has indicated will take place. If the entire area were to be built according to the Landform <br /> plan, we feel that there is too much drainage sheeting across the entire parking area. As <br /> Mr. Foster has indicated the phase construction, they will be able to sheet drain a portion of <br /> the parking lot to the south and will then need some type of rock swale leading to the <br /> existing catch basin on the site. In the future, when further development occurs, <br /> strategically placed catchbasins will be required to pick up the drainage. <br /> 3. We have the following comments on the Preliminary Site Plan: <br /> • The access off of Evans Street is shown as 24 feet wide. Perhaps this could be: <br /> widened slightly to 30 feet to provide additional room for vehicles to pass. <br /> • The parking stalls shown adjacent to the building site are 19 feet in depth_ According to <br /> • City ordinance, these could be 18 feet because of the allowable overhang at the curb <br /> side. However, the parking shown away from the building site needs to be expanded <br /> from 38 feet for back-to-back parking to 40 feet, because there is no allowable <br /> overhang. <br /> n.gbDnn4111d'laiuln7cn2 >.-A..� <br /> VO/Eerd Z2:60 LEST-9Z—d3S <br />
The URL can be used to link to this page
Your browser does not support the video tag.