Laserfiche WebLink
• • i <br /> I 1 <br /> r <br /> DRILL CREW CHECK LIST <br /> LOG OF BORING NO.____ -5 Job NO. 1 f 1 v Client WATER LEVEL OBSERVATIONS <br /> co <br /> ENGINEER —R .5 SURFACE ELEV. Sheet I of I WL: �' WS OR WD <br /> rn <br /> DRILLER__ YLVA BORING STARTED b !�� WEATHER WI.: CR _ACR <br /> HELPER ..____ BORING COMPLETED '-/: /` ST SIZE SS SIZE WL: AB Hr.AB o <br /> RIG NO. `i STATION CASING USED SIZE WL 24 Hr.AB '' <br /> OFFSET HSA USED r2 A SIZE y .- TOPSOIL THICKNESS 4 - Ui <br /> Dopih or FILL THICKNESS <br /> Elevation PENETRATION RECORD R Op CAVE IN LEVEL: <br /> - �'t.;� • While Drilling and en <br /> Split s.oal•Str,vs t— <br /> ,.. • Sam lin IV <br /> v <br /> io Sampling <br /> ° 8" s' 8' c v d . LL After Boring —r <br /> r as Z. E7 -r <br /> 0 i Co0 5 S;r- Completion <br /> m o o E °' 2 Fool J a-- `m "�� r <br /> 0) w h a a WATER LOSS: <br /> CJI <br /> 1 Sample Description At To116 <br /> ~ <br /> a Percent Loss <br /> At .. To <br /> �9_ Al To <br /> • ,5/L7 <br /> �'/ '7/7�j1��� Percent Loss <br /> SID <br /> 744c " 7`7Z--OL 6177 /) - BOULDERS OR OBSTRUCTIONS: <br /> /ilor�'/ / Ora 7"Qc9 -3C . Al To <br /> ARTESIAN PRESSURE: (7 <br /> 0 <br /> Depthz <br /> dill <br /> Height of Soil RiseyIn Casingb•a J- <br /> ABBREVIATIONSrAB—After Boring <br /> ACR—After Casing Removal• <br /> AS—Auger Sample.BCR—Before Casing Removal <br /> • <br /> DB—Diamond BII <br /> DCI—Dry Cave In <br /> HA—Hand Auger <br /> HS—Hollow Stem Auger <br /> •PA—Power Auger • <br /> SS—Split Spoon Sampler <br /> • ; ;.ST—Thin Walled.Sampler <br /> RB—Rock Bit <br /> . ' •WB—Wash Boring ' <br /> WCI—Wel Cave In • <br /> UVD—While Drilling <br /> WL—Water Level 0 <br /> WS—While Sampling o <br /> - I ..._ • <br /> '1r � __ - --- CJI <br />