My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1998
>
07-28-1998
>
5.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 3:01:10 PM
Creation date
4/16/2018 3:01:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Planning Commisison/P 98-2 <br /> July 28, 1998 <br /> Page 2 <br /> The proposed changes include reducing the number of lots from 8 to 4, <br /> • shortening the length of the cu de sac and there is no proposed extension of <br /> the right-of-way. On the amended plat, the farmstead is on a 70 acre lot and <br /> the single family home is on a 10 acre parcel. There are two lots available for <br /> development. The opportunity exists for a replating of the largest lot should <br /> the zoning code change to allow smaller lots. At that time the road would <br /> likely be extended to the edge of the plat or possibly looped through the <br /> property back to County Road 21. <br /> Background <br /> Physical characteristics <br /> The site has been mined. Characteristics of the site include wetlands, some <br /> flat areas that were part of the floor of the gravel mine, sloped areas that are <br /> a result of the reclamation process and wooded areas that have not been <br /> mined. The topography rises 60 feet from the west to the east; the west being <br /> the area that has been mined and the east area not affected by the gravel <br /> mining. <br /> The property is within the Mineral Extraction Overlay District; a gravel <br /> mining operation has been an ongoing process for many years. The mining on <br /> • the majority of the property is finished and is in the process of going through <br /> the reclamation process. Some small scale gravel mining will continue in the <br /> southwest corner of the plat on the 70 acre parcel. However, access to the <br /> area that will be mined will be off of County Road 21 through the 70 acre lot. <br /> Mining traffic will not go through the subdivision. Once the mining is <br /> finished the area will go through the reclamation process. <br /> Lot Size and Access <br /> The lot sizes for the four lots are Lot 1 - 5.9 acres, Lot 2 - 3.2 acres, Lot 3 - 10 <br /> acres and Lot 4 - 70 acres. All of the lots will have frontage on the proposed <br /> cul de sac with lots 1 through 3 having access from the cul de sac and lot 4 <br /> utilizing an existing driveway on County Road 21. <br /> There is one 14,700 square foot outlot included with this plat. It is located on <br /> the south side of lot 4. It will be made part of an adjacent lot, not included as <br /> part of this plat, that is owned by the applicant. <br /> The proposed cul de sac is about 900 feet long. The subdivision regulations <br /> allow a maximum length of 700 feet. The longer cul de sac is needed to <br /> provide adequate frontage for the 70 acre parcel and to allow for enough <br /> • <br /> \\e lkriver\sys\shrdoc\planning\scott\p98-2a md.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.