Laserfiche WebLink
<br /> <br /> <br />. <br /> <br />THE REGULAR MEETING OF THE ELK RIVER CITY COUNCIL <br />HELD AT THE ELK RIVER PUBLIC LIBRARY <br />MONDAY, SEPTEMBER 23, 1985 <br /> <br />Members present: Mayor Hinkle, Councilmembers Gunkel, Williams, <br />Engstrom and Schuldt. <br /> <br />Members Absent: None <br /> <br />Staff Present: Torn Bublitz, City Administratorl Terrv Maurer, <br />City Engineer; Dave Sellergren, Citv Attorney; <br />and Darrell Mack, Sewer Superintendent. <br /> <br />1. The Meeting Was Called to Order at 7:30 p.m. bv Mavor Hinkle. <br /> <br />2. ~sE:uda <br /> <br />It.ems 10 1/2 Progr"am for" Star Cities Pr"esentation, and 11 1/2 <br />Winter Road Maintenance were added to the agenda. <br /> <br />COUNCILMEMBEe_SC8ULDI_MO~ED_Io_~eeeO~E_I8E_SEeIEMBEa_23~ <br />i285_CIIY_COUNCIL_~GEND~_~S_~ME~DED___COUNCILMEMBEa_GU~KEL <br />SECONDED_I8E_MOIION___I8E_MOIO~_e~SSED_4=Q_ <br /> <br />3. ConsidE:caLiou_of_EE:asihi~iL~_SLUd~_Eoc_SaniLaC~_SE:wE:C_and <br />WaLE:c_Main_lmeco~E:mE:nLs_on_SimonE:t_Dci~E:. <br /> <br />Terrv Maurer, the City's Engineer, stated that he had <br />completed the feasibilitv studv for sanitarv sewer and water <br />main improvement5 on Simonet Drive, 6th Street and Xenia <br />Avenue. He further stated that the feasibilitv studv <br />included sanitary sewer, water main and restoraton of streets <br />and also stated that the cost per unit for sewer, water and <br />street restoration was 58,600. <br /> <br />Frontage road constructon along Highwav 10 was discussed and <br />the City Engineer indicated that he had spoken with Mr. Jim <br />Pavich of MnDOT and was told that according to MnDOT, <br />frontage roads are local streets and was also told that with <br />the current construction project on Highwav 10 there would be <br />no chance of obtaining funding in the foreseeable future. <br />Terry Maurer then stated that any frontage road construction <br />would have to be a City project using local funding. <br /> <br />It was the consensus of the Citv Council that Terrv Maurer, <br />the Citv Enginner, get a rough estimate of the cost and the <br />details involved in a frontage road. <br /> <br />COUNCILMEMBEe_GUNKEL_MO~ED_IO_~DoeI_aESOLUIION_85=48_~ <br />aESOLUIION_eECEl~l~G_EE~SlBlLlIY_SIUDY_~ND_C~LLlNG_EOa_eUBLIC <br />8E~elNG_ON_S~NlI~aY_SEWEa_~ND_W~IEe_M~lN_lMeaO~EMENIS_ON <br />SlMONEI_Del~E~_SlXI8_SIaEEI_~ND_XENl~_~~ENUE_~lMeeO~EME~I <br />eaO~ECI_i285=31___COUNCILMEMBEa_SC8ULDI_SECONDED_I8E_MOIIO~_ <br />18E_MOIIO~_eASSED_4=Q_ <br />